Gujarat Electricity Grid Code, 2013
Replaced byGujarat Electricity Grid Code, 2026- Metering and Protection Standards (Clause No. 6.46, 6.68) › V. Tariff Metering… Net Reactive Energy export/ import when voltage is below 97% (d) Cumulative active energy export/ import. (e) Average frequency for each 15 minute time block of the day (f) Provision of storage of data in non-volatile memory for at least …
- Regulatory Requirements of Special Energy Meters (Clause No …… Special energy meters of a uniform technical specification shall be provided on the electrical periphery of each state constituent, to determine its actual net interchange with the state grid. Each interconnection shall have one (1) main …
3 matching passages in this document
Electricity Supply Code and Related Matters Regulations, 2015
4 amendments on Voltaic
- TABLE OF CONTENTS… AND MODIFICATION IN EXISTING CONNECTION 15 Licensee’s obligation to Supply Licensee’s obligation to extend the distribution system and consumer’s share in the 15 cost 15 Conditions for Grant of Connection 15 Purchase of existing property …
- Recovery of Arrears › Assessment… 7.12 Where it is established that there is a case of theft of energy, the Assessing Officer shall assess the energy consumption as per the assessment formula given in Annexure IV to this Code. The period of assessment may be arrived at …
3 matching passages in this document
Gujarat Electricity Distribution Code
3 amendments on Voltaic
- 4.6 ENERGY AUDIT4.6 ENERGY AUDIT 1 The Distribution Licensee shall create responsibility centres for energy audit. Cities and towns with population of 50,000 and above, shall be made as responsibility centres and accountable for the energy sales and …
- 7.4 MEASUREMENT OF ENERGY IMPORT/ EXPORT… and substations for the measurement of energy import/export from each Connection Point/ Interface Point, energy generated in generating units and energy consumed in power stations and substations: (a) Active energy import. (b) Active …
3 matching passages in this document
Electricity Supply Code and Related Matters Regulations, 2015 — Consolidated up to September 2024
- Requirement of Meters… The meters shall have a facility for "Time of the Day" metering and storage of at least 45 days. The consumer shall have the option to install meter having facility to record peak hours MDI in addition to above features. 2 Such meter …
- Hearing in case of suspected Unauthorised Use of Electricity › Assessment… In addition to this, the energy charges to be recovered on differential basis at penal rate, if tariff of energy charge changes due to increased load with respect to the slab of contracted load and actual connected load. …
3 matching passages in this document