GERC · Gujarat Electricity Regulatory Commission
Electricity Supply Code and Related Matters Regulations, 2015 — Consolidated up to September 2024
Gujarat Electricity Regulatory Commission (Electricity Supply Code and Related Matters) Regulations, 2015
Consolidated copyDated 20 Sep 2015Notification No. 4 of 2015
A consolidated copy of the Electricity Supply Code and Related Matters Regulations, 2015, published by GERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.
Summary
Summary written by software, from pages 1 to 26 of 91. Check the regulator's original before you rely on it.
The GERC (Electricity Supply Code and Related Matters) Regulations, 2015 — the Supply Code — is the Commission's principal instrument for the day-to-day relationship between Gujarat's distribution licensees and their consumers. It is made under s.181(2)(x) read with s.50 of the Electricity Act 2003 and s.42(1)(b) of the Gujarat Electricity Industry (Reorganisation and Regulation) Act 2003, and applies to all distribution licensees including deemed licensees, all consumers in Gujarat, transmission licensees for clause 4.32, persons exempt under s.13, and cases of unauthorised supply, unauthorised use and theft (p1). It comes into force on Gazette publication.
This is a consolidated text: footnotes track the First Amendment 2016 (effective 23.11.2016), the Third Amendment 2023 (effective 06.12.2023), a corrigendum dated 01.01.2024, and the Fourth Amendment 2024 (effective 23.09.2024) (pp1–26, passim).
Section 1 sets up the Supply Code Review Panel — composition, two-year tenure, and functions covering code review, accident-cause review and six-monthly meetings — plus the route for amendment requests, a 72-hour reporting duty when a licensee acts in contingency, confidentiality of consumer information, and the rule that disputes go to the Commission, whose decision is final (p7–9). Section 2 gives interpretation rules and the defined vocabulary used throughout (p9–15). Section 3 fixes the voltage and phase at which supply is given by connected-load/contract-demand band, requires power-factor correction for motive-power consumers, and governs parallel operation of consumer generating sets (p16–18). Section 4, the longest, sets out the full new-connection and modification workflow — licensee obligations, cost sharing, document requirements, registration and application tracking, inspection timelines, demand notes, temporary supply, transfer, reclassification, load changes and agreements (p18–42). The remaining parts cover apparatus within consumer premises (p43), metering, testing, replacement and billing (p46), theft and unauthorised-use enforcement (p64), disconnection and reconnection (p72), and general provisions (p75).
Read with this
The regulation
- Dated 21 Sep 2015Electricity Supply Code and Related Matters Regulations, 2015
Amendments and corrections
- Dated 22 Nov 2016Electricity Supply Code and Related Matters Regulations, 2015 — First Amendment, 2016
- Dated 16 Jan 2020Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2020
- Dated 5 Dec 2023Electricity Supply Code and Related Matters, 2015 — Third Amendment Regulations, 2023
- Dated 1 Jan 2024Electricity Supply Code and Related Matters (Third Amendment) Regulations, 2023 — Corrigendum, 2024
- Dated 1 Jan 2024Electricity Supply Code and Related Matters (Third Amendment) Regulations, 2023 — Corrigendum
- Dated 23 Sep 2024Electricity Supply Code and Related Matters Regulations, 2015 — Fourth Amendment, 2024
Commencement notices and reasons
Proposed changes (drafts with no final yet)
- Dated 17 Oct 2026Electricity Supply Code and Related Matters Regulations, 2015 — Fifth Amendment, 2026 — Draft
- Dated 17 Oct 2026Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Fifth Amendment, 2026 — Explanatory Memorandum — Draft
Earlier drafts
- Dated 11 Nov 2014Draft Gujarat Electricity Supply Code and Related Matters, 2014
- Dated 28 Sep 2016Electricity Supply Code and Related Matters (First Amendment) Regulations, 2016 — Draft
- Dated 28 Sep 2016Explanatory memorandum: Electricity Supply Code and Related Matters, 2015 — First Amendment, 2016 — Explanatory Memorandum — Draft
- Dated 2 Aug 2017Electricity Supply Code and Related Matters, 2015 — Second Amendment, 2017 — Draft
- Dated 24 Nov 2019Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2019 — Draft
- Dated 24 Nov 2019Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Second Amendment, 2019 — Explanatory Note — Draft
- Dated 19 Feb 2022Electricity Supply Code and Related Matters Regulations, 2015 — Third Amendment, 2022 — Draft
- Dated 19 Feb 2022Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Draft Amendments — Explanatory Memorandum
- Dated 31 Aug 2024Electricity Supply Code and Related Matters, 2015 — Fourth Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Electricity Supply Code and Related Matters, 2015 — Fourth Amendment, 2024 — Explanatory Note — Draft
6 more documents belong here and are not on Voltaic: 6 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.