Electricity Supply Code and Related Matters Regulations, 2015 — Consolidated up to September 2024

Gujarat Electricity Regulatory Commission (Electricity Supply Code and Related Matters) Regulations, 2015

Consolidated copyDated 20 Sep 2015Notification No. 4 of 2015

A consolidated copy of the Electricity Supply Code and Related Matters Regulations, 2015, published by GERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software, from pages 1 to 26 of 91. Check the regulator's original before you rely on it.

The GERC (Electricity Supply Code and Related Matters) Regulations, 2015 — the Supply Code — is the Commission's principal instrument for the day-to-day relationship between Gujarat's distribution licensees and their consumers. It is made under s.181(2)(x) read with s.50 of the Electricity Act 2003 and s.42(1)(b) of the Gujarat Electricity Industry (Reorganisation and Regulation) Act 2003, and applies to all distribution licensees including deemed licensees, all consumers in Gujarat, transmission licensees for clause 4.32, persons exempt under s.13, and cases of unauthorised supply, unauthorised use and theft (p1). It comes into force on Gazette publication.

This is a consolidated text: footnotes track the First Amendment 2016 (effective 23.11.2016), the Third Amendment 2023 (effective 06.12.2023), a corrigendum dated 01.01.2024, and the Fourth Amendment 2024 (effective 23.09.2024) (pp1–26, passim).

Section 1 sets up the Supply Code Review Panel — composition, two-year tenure, and functions covering code review, accident-cause review and six-monthly meetings — plus the route for amendment requests, a 72-hour reporting duty when a licensee acts in contingency, confidentiality of consumer information, and the rule that disputes go to the Commission, whose decision is final (p7–9). Section 2 gives interpretation rules and the defined vocabulary used throughout (p9–15). Section 3 fixes the voltage and phase at which supply is given by connected-load/contract-demand band, requires power-factor correction for motive-power consumers, and governs parallel operation of consumer generating sets (p16–18). Section 4, the longest, sets out the full new-connection and modification workflow — licensee obligations, cost sharing, document requirements, registration and application tracking, inspection timelines, demand notes, temporary supply, transfer, reclassification, load changes and agreements (p18–42). The remaining parts cover apparatus within consumer premises (p43), metering, testing, replacement and billing (p46), theft and unauthorised-use enforcement (p64), disconnection and reconnection (p72), and general provisions (p75).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Metering

Read with this

6 more documents belong here and are not on Voltaic: 6 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.