GERC · Gujarat Electricity Regulatory Commission
Electricity Supply Code and Related Matters Regulations, 2015
Gujarat Electricity Regulatory Commission (Electricity Supply Code and Related Matters) Regulations, 2015
CodeDated 21 Sep 2015Published in the Gazette 24 Sep 2015Notification No. 4 of 2015
4 amendments to it are on Voltaic, the latest dated 23 Sep 2024.
Summary
Summary written by software, from pages 1 to 21 of 64. Check the regulator's original before you rely on it.
This is GERC's principal Supply Code, notified as Notification No. 4 of 2015 in the Gujarat Government Gazette Extraordinary dated 24 September 2015 (p1). It is made under s.181(2)(x) read with s.50 of the Electricity Act 2003 and s.42(1)(b) of the Gujarat Electricity Industry (Reorganisation and Regulation) Act 2003 (p1). It applies to all distribution licensees including deemed licensees, all consumers in Gujarat, persons exempted under s.13 of the Act, and unauthorised supply/use/diversion/theft (p1–2). It comes into force on Gazette publication (p2).
The Code is arranged in nine sections plus annexures (p2). Section 1 (p6–8) creates the Supply Code Review Panel — its composition, two-year tenure, functions on review and implementation, accident-review role, and the procedure for requesting amendments. It also covers limitations, confidentiality, dispute reference to GERC, and says the Code must be read with GERC's Standards of Performance, Miscellaneous Charges and Security Deposit Regulations.
Section 2 (p8–13) is the definitions section, fixing terms such as LT/HT/EHT consumer classes, contracted load/sanctioned load, maximum demand, distribution system, point of supply, check meter and theft.
Section 3 (p13–15) governs the system of supply and consumer classification: grid-frequency compliance, voltage variation limits, a rated voltage profile whose table is not captured in the supplied text, power-factor obligations for three-phase and motive-power consumers, shunt capacitor requirements, parallel operation of consumer generating sets, and tariff-category classification approved by GERC.
Section 4 (p15–21, continuing to p29) sets the new-connection and modification procedure: licensee supply obligation, extension cost-sharing, conditions for grant, purchase/reconstruction of property, application forms and documentary proofs, processing and inspection, demand note, payment and lapse, testing, temporary supply up to 12 months, transfer, conversion, shifting, reclassification, load enhancement/reduction and agreement execution.
The table of contents (p3–5) shows the remaining structure: Section 5 on apparatus within consumer premises; Section 6 on metering and billing; Section 7 on restrictions including theft and unauthorised use; Section 8 on disconnection and reconnection; and Section 9 on general provisions including load shedding, demand-side management, standards of performance, grievance redressal, repeal and savings. Annexures I–IV list the connection application forms, tariff details and theft-assessment format. Annexed forms are guidance and licensees may amend them with prior Commission approval (p1).
Read with this
Amendments and corrections
- Dated 22 Nov 2016Electricity Supply Code and Related Matters Regulations, 2015 — First Amendment, 2016
- Dated 16 Jan 2020Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2020
- Dated 5 Dec 2023Electricity Supply Code and Related Matters, 2015 — Third Amendment Regulations, 2023
- Dated 1 Jan 2024Electricity Supply Code and Related Matters (Third Amendment) Regulations, 2023 — Corrigendum, 2024
- Dated 1 Jan 2024Electricity Supply Code and Related Matters (Third Amendment) Regulations, 2023 — Corrigendum
- Dated 23 Sep 2024Electricity Supply Code and Related Matters Regulations, 2015 — Fourth Amendment, 2024
Commencement notices and reasons
Consolidated copies, for reference (1)
Proposed changes (drafts with no final yet)
- Dated 17 Oct 2026Electricity Supply Code and Related Matters Regulations, 2015 — Fifth Amendment, 2026 — Draft
- Dated 17 Oct 2026Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Fifth Amendment, 2026 — Explanatory Memorandum — Draft
Earlier drafts
- Dated 11 Nov 2014Draft Gujarat Electricity Supply Code and Related Matters, 2014
- Dated 28 Sep 2016Electricity Supply Code and Related Matters (First Amendment) Regulations, 2016 — Draft
- Dated 28 Sep 2016Explanatory memorandum: Electricity Supply Code and Related Matters, 2015 — First Amendment, 2016 — Explanatory Memorandum — Draft
- Dated 2 Aug 2017Electricity Supply Code and Related Matters, 2015 — Second Amendment, 2017 — Draft
- Dated 24 Nov 2019Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2019 — Draft
- Dated 24 Nov 2019Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Second Amendment, 2019 — Explanatory Note — Draft
- Dated 19 Feb 2022Electricity Supply Code and Related Matters Regulations, 2015 — Third Amendment, 2022 — Draft
- Dated 19 Feb 2022Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Draft Amendments — Explanatory Memorandum
- Dated 31 Aug 2024Electricity Supply Code and Related Matters, 2015 — Fourth Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Electricity Supply Code and Related Matters, 2015 — Fourth Amendment, 2024 — Explanatory Note — Draft
6 more documents belong here and are not on Voltaic: 6 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of GERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.