Skip to content

GERC · Gujarat Electricity Regulatory Commission

Gujarat Electricity Distribution Code

GUJARAT ELECTRICITY DISTRIBUTION CODE

CodeDated 24 Aug 2004

3 amendments to it are on Voltaic, the latest dated 30 Jun 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software, from pages 1 to 35 of 47. Check the regulator's original before you rely on it.

This is the Gujarat Electricity Distribution Code, issued by the Gujarat Electricity Regulatory Commission for the State of Gujarat under s.42(b) of the Gujarat Electricity Industry (Reorganisation and Regulation) Act 2003 and s.86(c), (e) and (i) of the Electricity Act 2003 (p7). It is a technical and operational code for the distribution system: it states the rights and obligations of distribution licensees and users, and says it is not exhaustive, so licensees and users must also comply with other codes, standards and regulations (p7).

After definitions and interpretation rules (Section 2, p10–12), Section 3 creates a standing Distribution Code Review Panel and the process for reviewing and revising the code, with GERC approval; provisional emergency revisions are possible but must be reported to GERC (p13–15). Section 4 is the Distribution Planning Code: load data, five-year forecast methodology, technical and design criteria, standardisation, and energy-audit responsibility centres (p16–21). Section 5 sets connectivity conditions: minimum technical criteria, operational labelling, system performance, connection/interface boundary rules, and references to the Supply Code for applications and connection agreements (p22–24).

Section 6, the Operation Code, covers demand estimation, outage planning, contingency planning and black-start coordination, demand management and load shedding, interface with small generating units and CPPs, communication, voltage/frequency/power-factor monitoring, safety coordination including Control Persons and Line Clear Permits, maintenance and testing, tools/spares, and training (p25–30). Section 7, Metering and Protection Code, specifies operational metering, tariff/commercial metering, import/export measurement with main and check meters, accuracy-class requirements, testing/calibration, protection system requirements for transformers and lines, and fire protection (p31–34). Section 8 begins the Cross Boundary Safety Code, dealing with Control Persons and procedures for work across control boundaries (p35. The table of contents also lists Section 9 Incident/Accident Reporting (p38–39), Attachment-1 Distribution System Planning and Security Standard (p40–46) and Annexure 1 load data format for 5 MW and above (p48).

Standard name
Distribution Code
Primary topics
Distribution system planning and operation, Technical standards, Metering

Read with this

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of GERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document