Search the library
Filters
Topic
DistributionGeneral / AdministrativeRenewable EnergyTariff & PricingGrid OperationsOpen AccessLicensing & ComplianceTransmissionYear
6 documents match “storage drawal T-GNA”.
The state and topic filters do not apply to a word search yet; the regulator, document type and year filters do.
Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Third Amendment, 2025
- 62. New Annexure-IV › (1) Grant of Connectivity with non-solar hour access to an …… from the Grid throughout the day for the purpose of charging power for storage, for quantum as applied for and permitted by the Nodal Agency vide the grant of Connectivity to such entity, in terms of these regulations, subject to …
- 54. Amendment to Regulation 37.2 of the Principal … › 55. New Regulation 37.10Entity shall specify the maximum drawal required from the grid for such additional capacity (for the purpose of charging power for storage), within the quantum of Connectivity, which shall be processed by the Nodal Agency based on …
3 matching passages in this document
Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022
- Preliminary › 2. Definition(ii) the agency designated for T-GNA for bilateral transactions which shall be RLDC of the region where point of drawal is located, for the purpose of Regulations 26 to 36 of these regulations;
- 28. Application for grant of T-GNA › 28.6. Application for grant of T-GNA, under bilateral …Application for grant of T-GNA for collective transactions by a power exchange shall contain Regional entity-wise injection or drawal (in MW) for each block. 28.8. The application fees in case of rejection of application for T-GNA shall be …
3 matching passages in this document
Indian Electricity Grid Code Regulations, 2023
- 33. OPERATIONAL PLANNING STUDY › (3) Power to revise schedulesSwitching on/off pump storage plants operating in pumping mode; (iv) Despatching emergency demand response measures; (v) Direct the SLDCs or other regional entities to increase or decrease their drawal or injection by revising their …
- 48. SCHEDULING FROM ALTERNATE SOURCE OF POWER BY A … › 49. PROCEDURE FOR SCHEDULING AND DESPATCH FOR INTER-STATE …… SLDC on behalf of the intra-State entities which are drawee GNA grantees, shall furnish time blockwise requisition for drawal to the concerned RLDC in accordance with the contracts, by 8 AM of "D-1" day. …
3 matching passages in this document
Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — First Amendment, 2023
- 16. New Regulation 20.4, Regulation 20.5 and Regulation 20.6 › 23. New Regulation 26.4, Regulation 26.5 and Regulation 26.6… or (b) it may convert full T-GNARE into T-GNA by making an application to the Nodal Agency. 26.5 The entities covered under Regulation 26.4 of these regulations may apply for additional GNARE or T-GNARE, in case their drawal requirement …
- CENTRAL ELECTRICITY REGULATORY COMMISSION NOTIFICATION › 16. New Regulation 20.4, Regulation 20.5 and Regulation 20.620.5 The entities covered under Regulation 20.4 of these regulations may apply for additional GNARE or T-GNARE, in case their drawal requirement is more than quantum of GNARE. …
3 matching passages in this document
Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2024
- 7. Capital Expenditure (CAPEX) › 8. UsersThe captive generating plant and Standalone storage system shall be considered as a user for the purpose of these regulations; (c) In the case of inter-State transmission licensees, …
- CHAPTER-10 BILLING AND OTHER MISCELLANEOUS PROVISIONS › 33. Regulation of access to defaulting entitiesT-GNA, including already approved T-GNA, for the sale and purchase of electricity through short term contracts, including in the power exchange, shall be regulated entirely: Provided further that the NLDC may, under exceptional …
3 matching passages in this document
Terms and Conditions of Tariff Regulations, 2024
- PRELIMINARY… Transmission System) Regulations, 2022 (excluding those granted "T-GNA"); …
- PRELIMINARY'Pumped Storage Hydro Generating Station' means a hydro generating station which generates power through energy stored in the form of water energy, pumped from a lower elevation reservoir to a higher elevation reservoir; (65) 'Rated …
3 matching passages in this document