Terms and Conditions of Tariff Regulations, 2024

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024

Regulation · Gazette copyDated 15 Mar 2024In force from 1 Apr 2024No. L-1/268/2022/CERC dated 15th March, 2024

The Gazette copy of the Terms and Conditions of Tariff Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 375 of 712. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission's principal tariff regulation for the 2024-29 control period, made under sections 61, 62, 79 and 178 of the Electricity Act, 2003 and notified in New Delhi on 15 March 2024 (p359). It comes into force on 1 April 2024 and, unless reviewed or extended, remains in force to 31 March 2029 (p359). It governs how the Commission determines tariff for inter-State generating stations and transmission systems, including integrated coal/lignite mines, for both existing projects (COD before 1.4.2024) and new projects (COD on or after 1.4.2024) (p361, p364).

Chapter 1 sets the title, commencement, scope and an extensive definitions list covering capital, fuel, mining, emission-control and grid terms (p359-367). Chapter 2 deals with date of commercial operation, including the COD of integrated mines and sale of infirm power, and the input price for coal/lignite supplied before an integrated mine's COD (p367-368). Chapter 3 lays down the procedure for tariff determination: who files, when, interim tariff, truing up for 2019-24 and 2024-29, and how under-recovery or excess recovery is reconciled (p368-372).

Chapter 4 sets the tariff structure - two-part capacity and energy charges for thermal stations, capacity and energy charges for hydro, transmission charges for transmission, plus a separate supplementary tariff for emission control systems (p372-373). Chapter 5 sets the debt-equity ratio norms for new and existing projects (p373-374). Chapter 6, beginning at p374, starts to specify what may be included in capital cost for new and existing projects, hydro projects and projects acquired through NCLT proceedings (p374-375).

The arrangement list on p224 signals further chapters and schedules.

Standard name
Tariff Regulations
Primary topics
Tariff determination, Generation tariff, Transmission tariff

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (2)

Earlier drafts

4 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document