Skip to content

CERC · Central Electricity Regulatory Commission

Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — First Amendment, 2023

Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (First Amendment) Regulations, 2023

Amendment · Gazette copyDated 1 Apr 2023Published in the Gazette 6 Apr 2023No. L-1/261/2021/CERC. dated 1st April, 2023

The Gazette copy of the Connectivity and General Network Access to the inter-State Transmission System (First Amendment) Regulations, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the First Amendment to CERC's Connectivity and General Network Access (GNA) Regulations, 2022, signed on 1 April 2023 and published in the Gazette on 6 April 2023 (p1, p11, p20). It is a clause-by-clause rewrite of the principal regulations — 33 amendment clauses plus a new annexure — with a Hindi version on pp1–10 and the signed English text on pp11–20.

The opening clauses deal with definitions and eligibility. Para 2 inserts definitions of GNARE, "Host State" and T-GNARE into Regulation 2.1, tying renewable-only network access to the renewable sources listed in the Sharing Regulations (p11–12). Para 3 lets a generating station or ESS add generation or storage capacity, including capacity owned by another entity, inside its granted connectivity with CTU approval, making the existing connectivity grantee the responsible "Lead generator"/"Lead ESS" (p12). Para 4 rewrites the documents a Renewable Power Park Developer must file and adds a new clause (xi) for REGS and ESS applicants, offering a letter of award/PPA, land title or a bank guarantee in lieu of land (p12).

Paras 8 and 21 are the substantive additions. New Regulations 11A and 11B impose conditions subsequent to a final connectivity grant — proof of land, an auditor's certificate of equity release, and financial closure — and prescribe revocation of connectivity, encashment and treatment of the Conn-BG instruments if they are not met (p13–14). New Regulation 24.6 sets out when connectivity is revoked for failure to achieve commercial operation, for termination of the LOA/PPA, and for power park developers and their constituent stations (p15–16). Paras 10, 11, 17 and 27 rework the return, amounts and forfeiture of Conn-BG1, Conn-BG2 and Conn-BG3 (p14, p15, p17–18).

The middle of the amendment defines who may hold which access product. New Regulations 20.4–20.6 create GNARE for entities under Regulation 17.1(ii) and (iii), allow conversion into GNA, make GNARE and GNA/T-GNA mutually exclusive, and permit non-renewable power to be scheduled under GNARE at the transmission deviation rate (p15); new Regulations 26.4–26.6 do the parallel job for T-GNARE (p17). Para 12 adds a new GNA applicant class — an entity connected intra-State but injecting into ISTS (p14); para 13 deems GNA for intra-State connected stations holding effective Long Term Access under the 2009 Connectivity Regulations (p14); para 9 lets a bulk consumer's GNA be used by, or for, its subsidiaries at the same ISTS connection point (p14).

The closing clauses cover relinquishment of GNA and its charges (Reg 25.1 and new Reg 25.3, p16–17), transmission-loss and charge treatment including direct settlement of T-GNA charges by power exchanges with SLDCs (p17), revision of the Nodal Agency's Detailed Procedure and formats subject to Commission directions (p18), an exemption from one-time GNA charges (p18), the Annexure-I table (p18–19) and a new Annexure-II giving the methodology, formula and CTU/NLDC responsibilities for quantifying a host State's "direct drawal" from a regional entity generating station (p19–20).

Commencement is deliberately deferred: the regulations take effect on a date the Central Commission is yet to notify (p11), so the Gazette date of 6 April 2023 is not the operative date.

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Open access, Green energy open access

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (4)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document