UERC · Uttarakhand Electricity Regulatory Commission
Formats for Hydro
OrderDate not stated
Made under the Terms and Conditions for Determination of Multi Year Tariff Regulations, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a compendium of blank formats for hydroelectric generating stations, headed 'Formats for Hydro' (p1). Page 1 is a numbered catalogue of 35 forms; pp2–41 reproduce the formats themselves. The forms are structured around a five-year window — previous year (n−1) actuals/audited, current year (n) with Apr–Sep actual and Oct–Mar estimate, and ensuing years n+1 to n+3 projected — with n stated as FY 2024-25 (pp2–3). There are no operative clauses, no notification number, and no date of issue or Gazette publication.
The opening forms compute per-unit rate, revenue and revenue requirement, and annual fixed charges (F-1.1, F-1.2, F-3; pp2–3, p9). A second group deals with energy: saleable energy and PAF; monthly generation; salient features of the hydro project; and month-wise design energy/MW continuous for run-of-river stations (F-2.1–F-2.4; pp4–8). A large capital block then covers gross fixed assets and financing plan, asset-wise and aggregate depreciation, capital expenditure, CWIP, COD schedules, project cost break-ups, construction/supply packages, IDC and financing-charge drawdowns, additional capitalisation, de-capitalisation, ACE reconciliation and incidental expenditure during construction (F-4 to F-6.11; pp10–26).
The remaining forms address capital cost and financing structure, financial packages, outstanding loans, weighted-average and normative-loan interest, working capital interest, O&M/R&M/employee/A&G expenses, non-tariff income, truing-up and annual performance review, and return on equity (F-7 to F-14A; pp27–41). The formats repeatedly require audited or estimated data, reasons for deviations, and competent-authority/UERC approvals; one note references 'the Regulations' without naming them (p10, p15, p23).
Read with this
The regulation
Commencement notices and reasons
- Dated 17 Sep 2024Multi Year Tariff Regulations, 2024 — Statement of Reasons
Procedures and orders made under it
- Date not statedTransmission Formats
- Date not statedSLDC Formats
- Date not statedDistribution Formats
- Date not statedFormats for Thermal/Gas
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.