Skip to content

UERC · Uttarakhand Electricity Regulatory Commission

Formats for Hydro

OrderDate not stated

Made under the Terms and Conditions for Determination of Multi Year Tariff Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a compendium of blank formats for hydroelectric generating stations, headed 'Formats for Hydro' (p1). Page 1 is a numbered catalogue of 35 forms; pp2–41 reproduce the formats themselves. The forms are structured around a five-year window — previous year (n−1) actuals/audited, current year (n) with Apr–Sep actual and Oct–Mar estimate, and ensuing years n+1 to n+3 projected — with n stated as FY 2024-25 (pp2–3). There are no operative clauses, no notification number, and no date of issue or Gazette publication.

The opening forms compute per-unit rate, revenue and revenue requirement, and annual fixed charges (F-1.1, F-1.2, F-3; pp2–3, p9). A second group deals with energy: saleable energy and PAF; monthly generation; salient features of the hydro project; and month-wise design energy/MW continuous for run-of-river stations (F-2.1–F-2.4; pp4–8). A large capital block then covers gross fixed assets and financing plan, asset-wise and aggregate depreciation, capital expenditure, CWIP, COD schedules, project cost break-ups, construction/supply packages, IDC and financing-charge drawdowns, additional capitalisation, de-capitalisation, ACE reconciliation and incidental expenditure during construction (F-4 to F-6.11; pp10–26).

The remaining forms address capital cost and financing structure, financial packages, outstanding loans, weighted-average and normative-loan interest, working capital interest, O&M/R&M/employee/A&G expenses, non-tariff income, truing-up and annual performance review, and return on equity (F-7 to F-14A; pp27–41). The formats repeatedly require audited or estimated data, reasons for deviations, and competent-authority/UERC approvals; one note references 'the Regulations' without naming them (p10, p15, p23).

Primary topics
Tariff determination, Generation tariff, Capital cost and investment

Read with this

Commencement notices and reasons

Procedures and orders made under it

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document