Skip to content

UERC · Uttarakhand Electricity Regulatory Commission

Transmission Formats

Formats for Transmission

OrderDate not stated

Made under the Terms and Conditions for Determination of Multi Year Tariff Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a compendium of blank filing formats — an annexure of templates, not a set of operative tariff provisions. Its index (p1) lists 45 formats, Form 1 to Form 21.3, covering the statements a transmission licensee (called the 'Petitioner' on each form) must file to support an Aggregate Revenue Requirement and transmission tariff petition, and the related truing-up.

The opening formats build the revenue requirement picture: an ARR summary of energy, revenue, expenditure, return and surplus/shortfall (p2), then Return on Equity and details of additional RoE (p3–4). Asset and performance statements follow — transmission lines and substations by voltage class and type (p5), transmission losses (p6), Transmission Availability Factor (p7), income from investments, non-tariff income and income from other business under s.41 of the Electricity Act (p8), and open-access related charges (p9).

Expenditure formats follow: an O&M summary (p10) with sub-formats for employee expenses and employee numbers (p11), repair & maintenance (p12) and administration & general expenses (p13). The capital-side block runs from p14 to p28 — statements of total gross fixed asset and of GFA funded or not funded through deposit works, capital subsidy and grants (p14–20); element-wise project cost break-up for transmission or communication systems (p21–24); construction/supply/service package break-up (p24–25); element-wise project cost (p25); additional capitalisation after COD and its financing (p26–28); scheme-wise capital expenditure (p28); incidental expenditure during construction (p29); and de-capitalisation (p30).

Depreciation and capital expenditure formats follow (p31–37), then the financing set: IDC and financing-charge draw-down schedule (p38–39), capital cost and financing structure (p40), financial packages (p41–42), outstanding loans, weighted-average interest and interest on normative loans (p43–46), interest and finance charges (p47) and interest on working capital (p48). The final block is forward-looking and performance reporting: investment plans for proposed and actual works (p49–50), a summary of truing up with controllable/uncontrollable variance analysis (p51), shunt capacitor addition/repair (p52), electrical accidents (p53) and transformer failures (p54).

The document consists entirely of empty templates with column headings and footnotes. It sets no values, names no petitioner, and states no commencement date or issuing notification.

Primary topics
Transmission tariff, ARR and true-up, Tariff determination

Read with this

Commencement notices and reasons

Procedures and orders made under it

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document