UERC · Uttarakhand Electricity Regulatory Commission
SLDC Formats
Formats for SLDC
OrderDate not stated
Made under the Terms and Conditions for Determination of Multi Year Tariff Regulations, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This document is a set of formats for the State Load Despatch Centre (SLDC) to use in regulatory filings. Page 1 is an index of 27 forms, F-1 to F-13, with sub-forms F-3.1, F-3.2, F-3.3, F-4.1, F-4.2 and multiple F-6 forms. The templates then appear as: F-1 Summary of Aggregate Revenue Requirement (p2), F-2 Capital Contribution, Grants, Subsidies (p3), F-3 Operation and Maintenance Expenses (p4), F-3.1 Employee Expenses (p5–6), F-3.2 Administration and General Expenses (p7), F-3.3 Repair & Maintenance Expenses (p8), F-4.1 Gross Fixed Asset (p9–10), F-4.2 Asset-wise Depreciation (p11–12), and F-5 Return on Equity (p13). Notes at p14 explain that deviations from UERC-approved expenditure must be explained, and ask for supporting approvals. Capital forms follow: F-6.1 Statement of Capital Expenditure (p14 and p17), F-6.2 Statement of Capital Works-in-Progress (p17–18), F-6.3 Element-wise Break-up of Project/Asset/Element Cost (p18), F-6.6 Incidental Expenditure during Construction (p21), F-7 Draw Down Schedule for Calculation of IDC & Financing (p23), F-8 Details of Capital Cost and Financing Structure (p24), F-9 Details of Financial Packages (p25), F-10.1 Statement of Outstanding Loans (p26–28), F-10.2 Calculation of Weighted Average Interest Rate on Actual Loans (p29), F-10.3 Calculation of Interest on Normative Loan (p30), F-11 Working Capital Requirement (p31), F-12 LDCD Fund (p32), and F-13 Investment Plan for Next 3 Years (p33). The forms cover historical actuals, current-year estimates split into Apr–Sep and Oct–Mar, and projections for years n+1 to n+3. No date, notification number or formal issuance clause is printed; the only approving authority named is UERC.
Read with this
The regulation
Commencement notices and reasons
- Dated 17 Sep 2024Multi Year Tariff Regulations, 2024 — Statement of Reasons
Procedures and orders made under it
- Date not statedFormats for Hydro
- Date not statedTransmission Formats
- Date not statedDistribution Formats
- Date not statedFormats for Thermal/Gas
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.