UERC · Uttarakhand Electricity Regulatory Commission
Formats for Thermal/Gas
OrderDate not stated
Made under the Terms and Conditions for Determination of Multi Year Tariff Regulations, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a formats annexure — a set of blank proformas a thermal or gas-based generating company fills in when it files a tariff petition, truing-up or annual performance review before the Commission (referred to as UERC on p16, and as "the Commission" on p49). Page 1 is an index of 41 numbered forms (F-1.1 through F-13). The body of the document is the forms themselves, mostly laid out as multi-year tables running from six years back (n-6) through the current year (n) to three ensuing years (n+3), split into audited actuals, current-year Apr–Sep actuals and Oct–Mar estimates, and projections (pp2–49).
The sequence follows a tariff petition: per-unit rate and revenue/revenue requirement (F-1.1, F-1.2, pp2–4); gross and net generation, auxiliary consumption, saleable energy, PAF, and the station's salient technical features (F-2.1 to F-2.3, pp4–6); net annual fixed charges and the energy-charge and fuel working (F-3, F-4.1, F-4.2A, pp7–9); gross fixed asset base, financing plan and asset-wise depreciation (F-5.1 to F-5.3, pp10–15).
The largest block is capital expenditure: year-wise capex, work-in-progress, capital cost estimates for new projects, COD schedules, head-wise capital cost break-up for gas projects, package-wise construction/supply/service costs, and draw-down schedules feeding IDC and financing charges — with separate formats where there has been a cost over-run or a time over-run (F-6.1 to F-6.10, pp16–28). Then additional capitalisation after COD and at the fag end of useful life, reconciliation of ACE with books, de-capitalisation, exclusions claimed and return on equity (F-6.11 to F-6.15A, pp29–35).
The closing forms cover capital cost and financing structure, financial packages, outstanding loans and weighted-average and normative interest computation (F-7 to F-9.3, pp36–42); interest on working capital specific to gas stations (F-10A, p43); O&M, R&M, employee and A&G expenses with headcount by cadre and grade (F-11 to F-11.3, pp44–47); non-tariff income (F-12, p48); and a truing-up / APR summary comparing approved, actual and revised figures with controllable and uncontrollable deviation reasons (F-13, p49). Nothing in the text states an issue date, an effective date or a control period.
Read with this
The regulation
Commencement notices and reasons
- Dated 17 Sep 2024Multi Year Tariff Regulations, 2024 — Statement of Reasons
Procedures and orders made under it
- Date not statedFormats for Hydro
- Date not statedTransmission Formats
- Date not statedSLDC Formats
- Date not statedDistribution Formats
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.