Skip to content

UERC · Uttarakhand Electricity Regulatory Commission

Multi Year Tariff Regulations, 2024 — Statement of Reasons

UERC (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2024

Statement of reasonsDated 17 Sep 2024

The commission's reasons for the Terms and Conditions for Determination of Multi Year Tariff Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software, from pages 1 to 33 of 46. Check the regulator's original before you rely on it.

This is the Statement of Reasons (SoR) issued by the Uttarakhand Electricity Regulatory Commission on 17 September 2024 alongside its Multi Year Tariff (MYT) Regulations, 2024 (p1). It is not itself an operative instrument: the Commission states explicitly that where the SoR deviates from the Regulations, the Regulations prevail (p1). Its purpose is to explain why the Commission accepted, modified or rejected the comments received on the draft Regulation (p1).

The opening paragraphs record the consultation: the earlier UERC Tariff Regulations, 2021 had a control period of 1 April 2022 to 31 March 2025; a draft for the next control period was issued, comments closed on 31 July 2024, and a public hearing was held on 30 August 2024 (p1). Annexure I (stakeholders who commented) and Annexure II (hearing participants) are referenced at p1.

The bulk of the document is paragraph 4, a clause-by-clause walk-through of the draft. Each sub-paragraph reproduces the draft provision, summarises the stakeholder submission, gives the Commission's reasoning, and prints the amended text. Matters covered in the supplied pages include: definitions in Regulation 3 — auxiliary energy consumption, control period, date of commercial operation, force majeure event (pp2–6); the MYT petition and capital cost certificates in Regulation 10 (pp6–7); annual performance review factors (pp8); capital cost and capital structure correction to the Standards of Performance Regulations citation (pp8–9); additional capitalisation, de-capitalisation and the prior-approval ceiling (pp9–13); return on equity and interest on loan (pp13–17); bad and doubtful debts (p17); working capital and prepaid metering (pp17–19); annual fixed charges and non-tariff income (pp19–20); auxiliary energy consumption norms for gas and hydro stations (pp20–22); O&M norms for gas stations, hydro R&M ceiling and hydro energy-shortfall recovery (pp22–27); distribution ARR (p27); short-term power procurement (pp28–30); distribution loss targets (pp30–32); FPPCA notification (pp32–33); and the start of the discussion on distribution O&M expenses (p33).

The most consequential change recorded is the Commission's decision, on UPCL's submission, to reinstate a three-year Control Period instead of the five years proposed in the draft (pp3–4). The document repeatedly rejects UPCL and UJVN Ltd. requests to relax limits, and corrects one typographical cross-reference to the Standards of Performance Regulations (pp8–9).

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, ARR and true-up

Read with this

Procedures and orders made under it

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document