Summary
Summary written by software, from pages 1 to 33 of 46. Check the regulator's original before you rely on it.
This is the Statement of Reasons (SoR) issued by the Uttarakhand Electricity Regulatory Commission on 17 September 2024 alongside its Multi Year Tariff (MYT) Regulations, 2024 (p1). It is not itself an operative instrument: the Commission states explicitly that where the SoR deviates from the Regulations, the Regulations prevail (p1). Its purpose is to explain why the Commission accepted, modified or rejected the comments received on the draft Regulation (p1).
The opening paragraphs record the consultation: the earlier UERC Tariff Regulations, 2021 had a control period of 1 April 2022 to 31 March 2025; a draft for the next control period was issued, comments closed on 31 July 2024, and a public hearing was held on 30 August 2024 (p1). Annexure I (stakeholders who commented) and Annexure II (hearing participants) are referenced at p1.
The bulk of the document is paragraph 4, a clause-by-clause walk-through of the draft. Each sub-paragraph reproduces the draft provision, summarises the stakeholder submission, gives the Commission's reasoning, and prints the amended text. Matters covered in the supplied pages include: definitions in Regulation 3 — auxiliary energy consumption, control period, date of commercial operation, force majeure event (pp2–6); the MYT petition and capital cost certificates in Regulation 10 (pp6–7); annual performance review factors (pp8); capital cost and capital structure correction to the Standards of Performance Regulations citation (pp8–9); additional capitalisation, de-capitalisation and the prior-approval ceiling (pp9–13); return on equity and interest on loan (pp13–17); bad and doubtful debts (p17); working capital and prepaid metering (pp17–19); annual fixed charges and non-tariff income (pp19–20); auxiliary energy consumption norms for gas and hydro stations (pp20–22); O&M norms for gas stations, hydro R&M ceiling and hydro energy-shortfall recovery (pp22–27); distribution ARR (p27); short-term power procurement (pp28–30); distribution loss targets (pp30–32); FPPCA notification (pp32–33); and the start of the discussion on distribution O&M expenses (p33).
The most consequential change recorded is the Commission's decision, on UPCL's submission, to reinstate a three-year Control Period instead of the five years proposed in the draft (pp3–4). The document repeatedly rejects UPCL and UJVN Ltd. requests to relax limits, and corrects one typographical cross-reference to the Standards of Performance Regulations (pp8–9).
Read with this
The regulation
Procedures and orders made under it
- Date not statedFormats for Hydro
- Date not statedTransmission Formats
- Date not statedSLDC Formats
- Date not statedDistribution Formats
- Date not statedFormats for Thermal/Gas
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.