HPERC · Himachal Pradesh Electricity Regulatory Commission
Cross Subsidy Surcharge, Additional Surcharge and Phasing of Cross Subsidy Regulations, 2006
Himachal Pradesh Electricity Regulatory Commission (Cross Subsidy Surcharge, Additional Surcharge and Phasing of Cross Subsidy) Regulations, 2006
RegulationDated 21 Aug 2006No. HPERC/ 391 dated August 21, 2006
1 amendment to it is on Voltaic, dated 9 Apr 2021.
A later regulation on Voltaic changes some of its provisions: Grant of Connectivity and Long-term and Medium-term Intra-State Open Access Regulations, 2010.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is HPERC's principal regulation governing the charges an open access consumer in Himachal Pradesh pays to a distribution licensee when it buys power outside the licensee's supply. Notification No. HPERC/391, dated Shimla 21 August 2006, is made under the Electricity Act 2003 and takes effect from publication in the Rajpatra, Himachal Pradesh (the Gazette date itself is not printed) (p1).
Regulation 1 sets the title and states the persons covered — anyone in transmission or distribution and open access customers, including captive power plants, in the State (p1). Regulation 2 defines only four terms and falls back on the Act for everything else (p1–2).
Regulation 3 makes the cross subsidy surcharge payable by open access consumers, but exempts captive generating plants carrying power to their own destination and supplies made under old consents or authorisations so long as those remain in force (p2). It adopts the National Tariff Policy's surcharge formula and explains each of its components — tariff, weighted average marginal power purchase cost, wheeling charge and voltage-level system losses (p2). Regulation 4 prescribes the phasing: the surcharge is to be run down over five years to a fraction of its opening level, with FY2006 as the base year and a year-wise percentage table running FY06 to FY11 (p2–3).
Regulation 5 makes the surcharge a compensatory charge payable to the licensee in whose area the power is delivered, sets who collects it monthly depending on whose wires are used, and directs how it is applied (p3). Regulation 6 creates the additional surcharge for a licensee's stranded obligation to supply — payable even by captive consumers — and lays down the test for when it applies, the licensee's duty to file fixed-cost details, the Commission's public consultation, and annual determination (p3–4). Regulation 7 allocates transmission and distribution losses in kind to open access consumers for technical losses only, splitting them when injection and drawal are at different voltages (p4).
Regulations 8 to 12 are the usual housekeeping clauses: the Commission may depart from its own procedure for justice, special circumstances or force majeure; it may amend, remove difficulties, issue orders and practice directions, and decides interpretation finally (p4–5).
Read with this
Amendments and corrections
- Dated 9 Apr 2021Cross Subsidy Surcharge, Additional Surcharge and Phasing of Cross Subsidy Regulations, 2006 — Second Amendment, 2021
- Dated 2 May 2010Changes some provisions: Grant of Connectivity and Long-term and Medium-term Intra-State Open Access Regulations, 2010
Procedures and orders made under it
Earlier drafts
2 more documents belong here and are not on Voltaic: 1 amendment and 1 procedure or order made under it.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.