HPERC · Himachal Pradesh Electricity Regulatory Commission
Cross Subsidy Surcharge, Additional Surcharge and Phasing of Cross Subsidy (Second Amendment) Regulations, 2021 — Finalisation Order
Himachal Pradesh Electricity Regulatory Commission (Cross Subsidy Surcharge, Additional Surcharge and Phasing of Cross Subsidy) (Second Amendment) Regulations, 2021.
OrderDated 9 Apr 2021Published in the Gazette 6 Mar 2021HPERC/391/2021 dated 9th April, 2021
Made under the Cross Subsidy Surcharge, Additional Surcharge and Phasing of Cross Subsidy Regulations, 2006.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a two-page HPERC order (HPERC/391/2021, Shimla, 9 April 2021) closing out the consultation on the Second Amendment to the Commission's Cross Subsidy Surcharge, Additional Surcharge and Phasing of Cross Subsidy Regulations and directing that the amendment be notified (p1–2).
The occasion is a clarification sought by M/s Sandhya Hydro Projects Balargha Pvt. Ltd. on whether additional surcharge can be levied on captive and group captive plants in Himachal Pradesh (p1). The order sets out the competing positions: Regulation 6(2) of the Principal Regulations, notified 21 August 2006 and published in the Rajpatra on 7 September 2006, makes additional surcharge payable by any consumer including one who puts up a captive plant; Section 9(2) and the fourth proviso to Section 42(2) of the Electricity Act 2003 protect open access for captive users (p1). The applicant also relied on an APTEL judgment in Appeal Nos. 311 and 315 of 2018 and on the Electricity Rules, 2005 (p1).
The order then records the process: the draft amendment was notified on 1 March 2021 and published in the Rajpatra on 6 March 2021; public objections were invited through two newspapers and the Commission's website on 11 March 2021, with the full draft text posted online; stakeholders including industry associations, the State Government, the Directorate of Energy, the Consumer's Representative and the distribution licensee were asked by letter of 12 March 2021 to respond by 30 March 2021 (p2). Only the Consumer's Representative and the Directorate of Energy replied, both stating they had no objections. The Commission therefore retained the draft provisions unchanged and finalised, approved and ordered notification of the draft amendment as it stood (p2).
The operative amendment text is not reproduced here and no Gazette publication date for the final regulations is printed, so the order's own commencement date is not visible from this document.
Read with this
The regulation
Amendments and corrections
- Dated 9 Apr 2021Cross Subsidy Surcharge, Additional Surcharge and Phasing of Cross Subsidy Regulations, 2006 — Second Amendment, 2021
- Dated 2 May 2010Changes some provisions: Grant of Connectivity and Long-term and Medium-term Intra-State Open Access Regulations, 2010
Procedures and orders made under it
- Dated 5 Sep 2008Determination of Open Access Charges Order, 2008
- Dated 19 Aug 2010Determination of Open Access Charges Order, 2010
Earlier drafts
2 more documents belong here and are not on Voltaic: 1 amendment and 1 procedure or order made under it.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.