HPERC · Himachal Pradesh Electricity Regulatory Commission
Cross Subsidy Surcharge, Additional Surcharge and Phasing of Cross Subsidy Regulations, 2006 — First Amendment, 2016 — Draft
Draft Himachal Pradesh Electricity Regulatory Commission (Cross Subsidy Surcharge, Additional Surcharge and Phasing of Cross Subsidy) (First Amendment) Regulations, 2016
Draft amendmentDated 11 Aug 2016No. HPERC/391 dated 11th August, 2016
Draft
A proposal that has since been finalised; the final regulation is not yet published on Voltaic.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a two-page notification in which the Himachal Pradesh Electricity Regulatory Commission, at Shimla on 11 August 2016, publishes for public objection a draft First Amendment to its 2006 Regulations on cross subsidy surcharge, additional surcharge and phasing of cross subsidy. The preamble (p1) recites the Principal Regulations of 2006, notes that the Ministry of Power's revised Tariff Policy of 28.01.2016 changed the cross subsidy surcharge formula, and states that the 2006 formula must be brought in line. The draft is issued under section 181(2) and section 42 of the Electricity Act, 2003 and is published under section 181(3) with Rule 3 of the Electricity (Procedure for Previous Publication) Rules, 2005; objections are invited within thirty days, and the text is also posted on the Commission's website (p1).
Regulation 1 gives the short title and says the regulations take effect from the date of publication in the Rajpatra, Himachal Pradesh (pp1–2). Regulation 2 substitutes sub-regulation (2) of Regulation 3 of the 2006 Regulations, replacing the surcharge method with the formula and component definitions drawn from the revised Tariff Policy, capping the surcharge, and permitting the Commission to review and vary the formula (p2). Regulation 3 substitutes Regulation 4, allowing the Commission to further restrict the surcharge for categories of consumers (p2). The notification closes with "By order of the Commission" (p2).
Read with this
The regulation
Amendments and corrections
- Dated 9 Apr 2021Cross Subsidy Surcharge, Additional Surcharge and Phasing of Cross Subsidy Regulations, 2006 — Second Amendment, 2021
- Dated 2 May 2010Changes some provisions: Grant of Connectivity and Long-term and Medium-term Intra-State Open Access Regulations, 2010
Procedures and orders made under it
Earlier drafts
2 more documents belong here and are not on Voltaic: 1 amendment and 1 procedure or order made under it.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.