Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Determination of Open Access Charges Order, 2010

Himachal Pradesh Electricity Regulatory Commission (Determination of Open Access Charges) Order, 2010

OrderDated 19 Aug 2010HPERC/418 dated 19th August, 2010

Made under the Cross Subsidy Surcharge, Additional Surcharge and Phasing of Cross Subsidy Regulations, 2006.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

HPERC's short order fixes the charges that open-access customers in Himachal Pradesh pay for the remainder of FY 2010-11. It was issued on 19 August 2010 under four sets of Commission regulations — the 2010 short-term open access regulations, the 2010 connectivity and long-term/medium-term open access regulations, the 2007 transmission tariff regulations and the 2006 cross-subsidy surcharge regulations (p1).

Paragraph 1 gives the title and commencement: the order takes effect on publication in the Rajpatra, Himachal Pradesh, though no Gazette date is printed (p1). Paragraph 2 is a sunset clause — it stays in force only until 31 March 2011 unless the Commission extends it, with variations or modifications (p1).

Paragraph 3 does the substantive work. Transmission open-access customers pay a transmission charge per MW per month plus a per-day SLDC/operating charge for each transaction (p1). Distribution open-access customers pay wheeling charges per unit, taken from the HPSEB tariff order for the FY 2010-11 MYT control period, the same per-day SLDC charge, and a cross-subsidy surcharge differentiated by supply and voltage category, tabulated on page 2 (p1–2). The order adds that any change in FY11 transmission and wheeling charges flowing from the true-up of ARR will apply accordingly (p2). It is signed by the Secretary by order of the Commission (p2).

Standard name
Open Access Regulations
Primary topics
Open access charges, Subsidy and cross-subsidy, SLDC and RLDC fees and charges

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document