Summary written by software. Check the regulator's original before you rely on it.
HPERC's short order fixes the charges that open-access customers in Himachal Pradesh pay for the remainder of FY 2010-11. It was issued on 19 August 2010 under four sets of Commission regulations — the 2010 short-term open access regulations, the 2010 connectivity and long-term/medium-term open access regulations, the 2007 transmission tariff regulations and the 2006 cross-subsidy surcharge regulations (p1).
Paragraph 1 gives the title and commencement: the order takes effect on publication in the Rajpatra, Himachal Pradesh, though no Gazette date is printed (p1). Paragraph 2 is a sunset clause — it stays in force only until 31 March 2011 unless the Commission extends it, with variations or modifications (p1).
Paragraph 3 does the substantive work. Transmission open-access customers pay a transmission charge per MW per month plus a per-day SLDC/operating charge for each transaction (p1). Distribution open-access customers pay wheeling charges per unit, taken from the HPSEB tariff order for the FY 2010-11 MYT control period, the same per-day SLDC charge, and a cross-subsidy surcharge differentiated by supply and voltage category, tabulated on page 2 (p1–2). The order adds that any change in FY11 transmission and wheeling charges flowing from the true-up of ARR will apply accordingly (p2). It is signed by the Secretary by order of the Commission (p2).
Read with this
The regulation
Amendments and corrections
- Dated 9 Apr 2021Cross Subsidy Surcharge, Additional Surcharge and Phasing of Cross Subsidy Regulations, 2006 — Second Amendment, 2021
- Dated 2 May 2010Changes some provisions: Grant of Connectivity and Long-term and Medium-term Intra-State Open Access Regulations, 2010
Procedures and orders made under it
Earlier drafts
2 more documents belong here and are not on Voltaic: 1 amendment and 1 procedure or order made under it.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.