HPERC · Himachal Pradesh Electricity Regulatory Commission
Grant of Connectivity and Long-term and Medium-term Intra-State Open Access Regulations, 2010
Himachal Pradesh Electricity Regulatory Commission (Grant of Connectivity, Long-term and Medium-term intra-State Open Access and Related Matters) Regulations, 2010
RegulationDated 2 May 2010No.HPERC/418 dated 2nd May, 2010
3 amendments to it are on Voltaic, the latest dated 15 Feb 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Himachal Pradesh Electricity Regulatory Commission issued these 40 regulations on 2 May 2010 to govern connectivity and long-term/medium-term intra-State open access on transmission and distribution systems in Himachal Pradesh (p1). Chapter 1 defines access categories: long-term access exceeds 12 years but not 25 years, medium-term exceeds 3 months but not 3 years, and short-term is up to one month (p2–3). Commencement is split: regulations 1, 2, 4 and 26 apply from publication in the Rajpatra, Himachal Pradesh; the rest apply on a later date notified by the Commission, which must be after approval of the detailed procedure under regulation 26 (p1).
Chapter 2 designates the State Transmission Utility as nodal agency for transmission-side connectivity/access and the State Load Despatch Centre for distribution-side matters, sets the application route and fees, and gives processing time limits (p3–5). Chapter 3 covers connectivity grants, interconnection studies, connection agreements and permission for infirm power testing (p5–6). Chapter 4 lays down criteria for long-term and medium-term access, including that medium-term access is accommodated without system augmentation, and a priority order placing distribution licensees, renewable/co-generation sources and captive plants ahead of other customers (p6–7). Chapter 5 details long-term applications, bank guarantees, system studies, tariff estimates, agreements, renewal and relinquishment compensation (p8–11). Chapter 6 does the same for medium-term access, including start-date windows and exit notice (p11–13). Chapter 7 sets operating conditions: curtailment and reverse curtailment priority, the detailed procedure, transmission/wheeling charges, UI and reactive energy charges, SLDC fees, payment arrangements, energy losses and interface meters (p13–17). Chapter 8 requires public information on open access on nodal agency websites (p17–18). Chapter 9 covers compliance, grievance redressal, general powers, removal of difficulties, and repeal of the 2005 Open Access Regulations and regulation 7 of the 2006 Cross Subsidy Surcharge Regulations with savings (p18–19).
Read with this
Amendments and corrections
- Dated 7 Dec 2012Grant of Connectivity, Long-term and Medium-term intra-State Open Access and Related Matters Regulations, 2010 — First Amendment, 2012
- Dated 11 Aug 2021Grant of Connectivity and Long-term/Medium-term intra-State Open Access Regulations, 2010 — Second Amendment, 2021
- Dated 15 Feb 2024Grant of Connectivity, Long-term and Medium-term intra-State Open Access and Related Matters Regulations, 2010 — Third Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of HPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.