HPERC · Himachal Pradesh Electricity Regulatory Commission
Cross Subsidy Surcharge, Additional Surcharge and Phasing of Cross Subsidy (Second Amendment) Regulations, 2020 — Draft
Himachal Pradesh Electricity Regulatory Commission (Cross Subsidy Surcharge, Additional Surcharge and Phasing of Cross Subsidy) (Second Amendment) Regulations, 2020
Draft amendmentDated 1 Mar 2021No. HPERC/391 dated 1st March, 2021
Draft
A proposal that has since been finalised as the Cross Subsidy Surcharge, Additional Surcharge and Phasing of Cross Subsidy Regulations, 2006 — Second Amendment, 2021.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a Himachal Pradesh Electricity Regulatory Commission notification dated 1 March 2021 (No. HPERC/391) that publishes, for objections, draft amendments to the Commission's 2006 Cross Subsidy Surcharge, Additional Surcharge and Phasing of Cross Subsidy Regulations (p1–2). It is a consultation-stage document rather than a concluded amendment: the draft regulations commence only from publication in the Rajpatra, Himachal Pradesh, and only after the thirty-day objection window has run (p2).
The recitals (p1) set out the problem the Commission is addressing. Regulation 6(2) of the 2006 Principal Regulations requires additional surcharge from any consumer, including one who puts up a captive plant; section 9(2) and the fourth proviso to section 42(2) of the Electricity Act, 2003 protect captive users' open access and bar such surcharge; and an APTEL judgment in Appeals 311 and 315 of 2018, along with the Electricity Rules, 2005, prompted a clarification request from M/s Sandhya Hydro Projects Balargha Pvt. Ltd. On that basis the Commission says it is necessary to amend Regulations 1 and 6 of the Principal Regulations.
The operative draft contains three regulations (p2). Regulation 1 gives the short title, extent and commencement and ties commencement to Rajpatra publication. Regulation 2 omits the words "including captive power plants" from sub-regulation (2) of Regulation 1 of the Principal Regulations. Regulation 3 omits sub-regulation (2) of Regulation 6 of the Principal Regulations outright. Objections or suggestions are invited to the Secretary, HPERC, within thirty days (p2).
Read with this
The regulation
Amendments and corrections
- Dated 9 Apr 2021Cross Subsidy Surcharge, Additional Surcharge and Phasing of Cross Subsidy Regulations, 2006 — Second Amendment, 2021
- Dated 2 May 2010Changes some provisions: Grant of Connectivity and Long-term and Medium-term Intra-State Open Access Regulations, 2010
Procedures and orders made under it
Earlier drafts
2 more documents belong here and are not on Voltaic: 1 amendment and 1 procedure or order made under it.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.