Open Access to Intra-State Transmission and Distribution Networks Regulation, 2005 — Consolidated
Andhra Pradesh Electricity Regulatory Commission (Terms and Conditions of Open Access) Regulation, 2005
Consolidated copyDated 31 Dec 2025Regulation No. 2 of 2005
A consolidated copy of the Terms and Conditions of Open Access Regulation, 2005, published by APERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.
Summary
Summary written by software. Check the regulator's original before you rely on it.
APERC's principal regulation on open access to intra-State transmission and distribution networks: Regulation No. 2 of 2005, presented as a consolidated text carrying the First Amendment (Regulation No. 1 of 2016, dated 08-01-2016) and the Second Amendment (Regulation No. 8 of 2025, dated 08-12-2025), both shown as footnoted provisos rather than rewritten clauses.
The preamble (p2) records the s.42(2) mandate and the 2004 consultative process, and makes the regulation under Electricity Act 2003 s.181(1) read with ss.42(2), 42(4), 39(2)(d)(ii) and 40(c)(ii). Clauses 1–2 (p2–4) fix territorial extent to Andhra Pradesh, commencement on Gazette publication, and define the working vocabulary — applicant, available capacity, contracted capacity, entry and exit point, Nodal Agency, open access user. Clause 3 applies the regulation to intra-State systems even when used in conjunction with the inter-State system (p4).
Clauses 4–9 (p4–9) are the eligibility and access architecture: long-term (two years or more) versus short-term (never more than one year); STU as nodal agency for long-term and SLDC for short-term; the planning-criteria test for long-term and margin-based tests for short-term; deemed long-term status for existing distribution licensees and continuation for other existing users; the phased roll-out of open access by category and contracted capacity, with provisos letting the Commission revise the schedule or exempt consumers; and priority rules for allotting scarce capacity, including price-based bidding for congested short-term corridors.
Clauses 10–12 (p9–12) govern the application and contracting machinery — application formats, monthly filing windows, acknowledgement and processing timelines, and the requirement to execute bipartite/tripartite/multi-partite open access agreements, with term and renewal rules. Clauses 13–16 (p13–16) cover metering at entry and exit points, the method for determining available T&D capacity, the underutilization and surrender regime with its compensatory-charge ladder, and the limited flexibility to change entry and exit points.
Clauses 17–18 (p16–19) set out the charges framework — transmission and wheeling charges as determined by the Commission and subject to a minimum level, cross-subsidy and additional surcharges, capital contribution towards augmentation, scheduling and system operation charges, and solar/wind and third-party-sale exemptions tied to State G.O.s — plus billing and payment terms, including the deemed-consumer rule where a user has no CMD with the distribution licensee. Clauses 19–26 (p19–24) deal with licensee–SLDC coordination and website disclosure, quality of supply, energy and demand balancing (with the 2025 provisions distinguishing open access consumers, scheduled consumers and open access generators) and curtailment priority, then general supply terms, dispute resolution, force majeure, orders and practice directions, removal of difficulties, saving and amendment powers. Annexure-1 (p25) lists the suggested contents of a long-term open access application.
Read with this
The regulation
- Published in the Gazette 1 Jul 2005Terms and Conditions of Open Access Regulation, 2005
Amendments and corrections
- Dated 8 Jan 2016Terms and Conditions of Open Access (First Amendment) Regulation, 2016
- Published in the Gazette 8 Jan 2016Terms and Conditions of Open Access Regulation, 2005 — First Amendment, 2016
Commencement notices and reasons
Proposed changes (drafts with no final yet)
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.