APERC · Andhra Pradesh Electricity Regulatory Commission

Open Access to Intra-State Transmission and Distribution Networks Regulation, 2005 — Consolidated

Andhra Pradesh Electricity Regulatory Commission (Terms and Conditions of Open Access) Regulation, 2005

Consolidated copyDated 31 Dec 2025Regulation No. 2 of 2005

A consolidated copy of the Terms and Conditions of Open Access Regulation, 2005, published by APERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

APERC's principal regulation on open access to intra-State transmission and distribution networks: Regulation No. 2 of 2005, presented as a consolidated text carrying the First Amendment (Regulation No. 1 of 2016, dated 08-01-2016) and the Second Amendment (Regulation No. 8 of 2025, dated 08-12-2025), both shown as footnoted provisos rather than rewritten clauses.

The preamble (p2) records the s.42(2) mandate and the 2004 consultative process, and makes the regulation under Electricity Act 2003 s.181(1) read with ss.42(2), 42(4), 39(2)(d)(ii) and 40(c)(ii). Clauses 1–2 (p2–4) fix territorial extent to Andhra Pradesh, commencement on Gazette publication, and define the working vocabulary — applicant, available capacity, contracted capacity, entry and exit point, Nodal Agency, open access user. Clause 3 applies the regulation to intra-State systems even when used in conjunction with the inter-State system (p4).

Clauses 4–9 (p4–9) are the eligibility and access architecture: long-term (two years or more) versus short-term (never more than one year); STU as nodal agency for long-term and SLDC for short-term; the planning-criteria test for long-term and margin-based tests for short-term; deemed long-term status for existing distribution licensees and continuation for other existing users; the phased roll-out of open access by category and contracted capacity, with provisos letting the Commission revise the schedule or exempt consumers; and priority rules for allotting scarce capacity, including price-based bidding for congested short-term corridors.

Clauses 10–12 (p9–12) govern the application and contracting machinery — application formats, monthly filing windows, acknowledgement and processing timelines, and the requirement to execute bipartite/tripartite/multi-partite open access agreements, with term and renewal rules. Clauses 13–16 (p13–16) cover metering at entry and exit points, the method for determining available T&D capacity, the underutilization and surrender regime with its compensatory-charge ladder, and the limited flexibility to change entry and exit points.

Clauses 17–18 (p16–19) set out the charges framework — transmission and wheeling charges as determined by the Commission and subject to a minimum level, cross-subsidy and additional surcharges, capital contribution towards augmentation, scheduling and system operation charges, and solar/wind and third-party-sale exemptions tied to State G.O.s — plus billing and payment terms, including the deemed-consumer rule where a user has no CMD with the distribution licensee. Clauses 19–26 (p19–24) deal with licensee–SLDC coordination and website disclosure, quality of supply, energy and demand balancing (with the 2025 provisions distinguishing open access consumers, scheduled consumers and open access generators) and curtailment priority, then general supply terms, dispute resolution, force majeure, orders and practice directions, removal of difficulties, saving and amendment powers. Annexure-1 (p25) lists the suggested contents of a long-term open access application.

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges, Congestion and curtailment

Read with this

The regulation

Proposed changes (drafts with no final yet)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.