Terms and Conditions of Open Access (First Amendment) Regulation, 2016
Andhra Pradesh Electricity Regulatory Commission (Terms and Conditions ofOpen Access) (FirstAmendment) Regulation, 2016
AmendmentDated 8 Jan 2016Published in the Gazette 8 Jan 2016Reeulation No.l of 2016 dated JANUARY 08,2016
Amends the Terms and Conditions of Open Access Regulation, 2005.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the first amendment to the APERC (Terms and Conditions of Open Access) Regulation, 2005, issued to give effect to the Andhra Pradesh Solar Power Policy, 2015 and Wind Power Policy, 2015. The preamble (pp1-3) explains that the State Government replaced its 2012 solar and 2008 wind policies with G.O.Ms.No.8 dated 12-02-2015 and G.O.Ms.No.9 dated 13-02-2015, and then asked the Commission, under s.108 of the Electricity Act, to adopt regulations carrying the incentives into effect. It lists the incentive parameters that fall within the Commission's remit — transmission and distribution charges for wheeling, distribution losses, open access clearance, and cross subsidy surcharge (pp2-3). A draft was published on 27-08-2015 and a public hearing held on 19-12-2015, after which developers and the State Government asked for the changes to apply from the dates of the policies rather than prospectively (p3).
The operative part is short. Clause 1 names the regulation and makes it retrospective by deeming it in force from 12-02-2015 for solar and 13-02-2015 for wind projects, tied to the policies' five-year operative windows (p3). Clause 2 adds a proviso to Para 10.6 of the principal regulation on deemed open access where the Nodal Agency does not respond in time (p4). Clause 3 inserts provisos into Para 17.1: exemption from transmission and wheeling charges for captive use or third-party sale within the State (p4); exemption of distribution losses for qualifying solar projects (p4); and exemption of cross subsidy surcharge and additional surcharge for third-party solar sale for a stated period from commissioning (p4).
Read with this
The regulation
- Published in the Gazette 1 Jul 2005Terms and Conditions of Open Access Regulation, 2005
Amendments and corrections
- Published in the Gazette 8 Jan 2016Terms and Conditions of Open Access Regulation, 2005 — First Amendment, 2016
Commencement notices and reasons
Consolidated copies, for reference (1)
Proposed changes (drafts with no final yet)
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.