APERC · Andhra Pradesh Electricity Regulatory Commission
Terms and Conditions of Open Access Regulation, 2005
Andhri. Pradesh Electricity Regulatory Commission (Terms and Conditions of Open Access) Regulation, 2005
RegulationPublished in the Gazette 1 Jul 2005Regulation No. 2 of2005
2 amendments to it are on Voltaic, the latest dated 8 Jan 2016.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Andhra Pradesh Electricity Regulatory Commission issued this principal regulation to operationalise open access in intra-state transmission and distribution networks under s.42 of the Electricity Act 2003. It extends to the whole of Andhra Pradesh and comes into force on publication in the AP Gazette, printed as July 1, 2005 (p1–2). The Commission had published a draft on 4 August 2004 and received 23 comments/suggestions before finalising the regulation (p2). It is expressly to be read with the Electricity (Removal of Difficulties) Second Order, 2005 dated 8 June 2005 (p2).
Clauses 1–4 set commencement, definitions, extent and user categories: long-term users contract for two years or more; short-term users are all others, but open access cannot be allowed for more than one year at a time (p3–4). Clause 5 assigns nodal agencies: STU for long-term and SLDC for short-term, with consultation and coordination requirements (p4). Clause 6 states the planning criteria for allowing access. Clauses 7–9 cover existing users, the phase-in schedule for eligible consumers by contracted capacity and NCE supply, priority in capacity allotment, and congestion handling including bidding when capacity is scarce (p4–7).
Clauses 10–12 prescribe application formats, fees, processing timelines, system studies and the open access agreement, including renewal rules and the requirement for licensees to get a standard agreement approved (p7–9). Clause 13 requires special energy meters at entry/exit points; clause 14 sets how licensees and nodal agencies determine available capacity; clause 15 deals with underutilisation, surrender, reduction/cancellation and compensatory charges; clause 16 permits limited changes to entry/exit points (p9–12). Clauses 17–18 govern transmission/wheeling charges, cross-subsidy and additional surcharges, capital contribution and payment terms (p12–14). Clauses 19–26 cover information exchange, quality of supply, energy/demand balancing, curtailment priority, general supply terms, dispute resolution, force majeure, practice directions, removal of difficulties, savings and amendment (p14–16). Annexure-1 lists the contents of an open access application (p17).
Read with this
Amendments and corrections
- Dated 8 Jan 2016Terms and Conditions of Open Access (First Amendment) Regulation, 2016
- Published in the Gazette 8 Jan 2016Terms and Conditions of Open Access Regulation, 2005 — First Amendment, 2016
Commencement notices and reasons
Consolidated copies, for reference (1)
Proposed changes (drafts with no final yet)
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of APERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.