APERC · Andhra Pradesh Electricity Regulatory Commission

Terms and Conditions of Open Access Regulation, 2005 — First Amendment, 2016

the Andhra Pradesh Electricity Regulatory Commission (Terms and Conditions of Open Access) (First Amendment) Regulation, 2016

AmendmentPublished in the Gazette 8 Jan 2016Regulation No.1 of 2016

Amends the Terms and Conditions of Open Access Regulation, 2005.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the First Amendment to the APERC (Terms and Conditions of Open Access) Regulation, 2005 (Regulation No.2 of 2005), notified in the Andhra Pradesh Gazette Extraordinary on 8 January 2016 as Regulation No.1 of 2016. The preamble (p1–3) explains why: the Government of Andhra Pradesh replaced its 2012 Solar and 2008 Wind policies with new 2015 policies (G.O.Ms.No.8 dated 12-02-2015 and G.O.Ms.No.9 dated 13-02-2015), and asked the Commission, citing s.108 of the Electricity Act 2003, to give them effect. The draft was published on 27-08-2015 and a public hearing held on 19-12-2015, after which the Commission agreed to make the amendments apply from the policy issue dates rather than from notification (p3).

Operatively the amendment makes three changes to the principal regulation. Clause 2 (p4) adds a proviso to Para 10.6 allowing an open access application to be deemed allowed if the Nodal Agency does not respond or intimate within 30 days of closure of a window. Clause 3 (p4) adds provisos to Para 17.1: exemption from transmission and wheeling charges for captive use or third-party sale within the State from solar and wind projects; exemption from distribution losses for solar projects injecting at 33 kV or below; and exemption from cross subsidy surcharge and additional surcharge for third-party sale from solar projects for five years from commissioning.

Clause 1 (p3) gives the short title and the deemed commencement dates — 12-02-2015 for solar and 13-02-2015 for wind — tied to the policies' operative periods running to 11-02-2020 and 12-02-2020 respectively. The instrument is retrospective by design and benefits only projects commissioned within those windows. Note the internal mismatch: the policies describe a 21-day deemed-open-access rule (p2–3), while the amendment sets 30 days from closure of a window (p4).

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges, Losses and loss reduction

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (1)

Proposed changes (drafts with no final yet)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.