Terms and Conditions of Open Access Regulation, 2005 — Second Amendment, 2025 — Statement of Reasons

Second Amendment to the Andhra Pradesh Electricity Regulatory Commission (Terms and Conditions of Open Access) Regulation, 2005 (Regulation No. 2 of 2005)

Statement of reasonsDated 4 Dec 2025Regulation No.08 of 2025 dated 04.12.2025

The commission's reasons for the Terms and Conditions of Open Access Regulation, 2005 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is APERC's Statement of Reasons/Order dated 04.12.2025 (p1) approving the Second Amendment to the APERC (Terms and Conditions of Open Access) Regulation, 2005 (Regulation No. 2 of 2005). It records the GoAP proposal under Section 108 of the Electricity Act, 2003, following the Integrated Clean Energy (ICE) Policy, 2024, and two rounds of public consultation on draft amendments (pp1-2, pp9-10). The operative amendment is in Annexure II as Regulation No.08 of 2025 (pp9-12), while pp1-7 explain the Commission's decisions on stakeholder objections.

Annexure II contains the short title, extent and commencement: it applies to the whole State of Andhra Pradesh and comes into force on publication in the AP Gazette (p10; Gazette date not printed). It adds a proviso to Clause 9.2 of the Principal Regulation: grid connectivity for Clean Energy Projects for the operative period in G.O. Ms. No. 37, dated 30.10.2024 is to be based on the progress and recommendation of the State Nodal Agency and subject to APERC-issued or approved regulations, guidelines or procedures (p10). The Statement of Reasons explains that the SNA (NREDCAP) monitors and recommends, but the final connectivity authority remains with APTRANSCO, SLDC and DISCOMs (pp2-3).

The central change substitutes Clause 19.4 on Energy and Demand Balancing (pp11-12). It requires contracted entry-point open access capacity to correspond to and not exceed approved exit-point capacity, and limits actual demand from all sources or sent-out capacity to the lower of line capacity, transfer capacity or technical feasibility. It sets separate rules for open access consumers, scheduled consumers, and open access generators; for solar generators it uses inverter capacity rather than DC capacity; it allows Green Energy Open Access consumers to contract multiple RE sources but caps drawal in any 15-minute block or schedule at technical limits or CMD, with SLDC limiting schedules and excess supplier injection treated as inadvertent energy; and it requires the OA user to bear network strengthening or augmentation and metering-infrastructure costs (pp11-12).

Annexure I lists objectors, including APDISCOMs, APTRANSCO, Ecoren Energy, consumer groups and industry associations (p8). The order also notes that a revised draft was issued on 19.08.2025, the comments deadline was extended to 15.09.2025, and ten stakeholders responded (pp1-2).

Standard name
Open Access Regulations
Primary topics
Open access, Green energy open access, Connectivity and GNA

Read with this

The regulation

Consolidated copies, for reference (1)

Proposed changes (drafts with no final yet)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document