Terms and Conditions of Open Access Regulations, 2005 — Second Amendment, 2025 — Draft

Second Amendment to the Andhra Pradesh Electricity Regulatory Commission (Terms and Conditions of Open Access) Regulation, 2005 (Regulation No. 2 of 2005)

Draft amendmentDated 26 Mar 2025

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the second amendment to APERC's 2005 Open Access Regulation. The opening pages set out the lineage of the instrument: the 2005 Principal Regulation (Regulation No. 2 of 2005), gazetted on 01.07.2005; its adoption by the newly constituted APERC for the residual State of Andhra Pradesh with effect from 01.08.2014 through the APERC (Adaptation) Regulation, 2014; and the first amendment (Regulation No. 1 of 2016) gazetted on 08.01.2016 (p1).

The trigger is the Government of Andhra Pradesh's Integrated Clean Energy (ICE) Policy, 2024, released on 16.10.2024, whose key features are summarised on pp1–2: an entire-value-chain and RE-manufacturing focus, the State's solar, wind and hybrid potential along with pumped storage, democratisation of generation through PM Surya Ghar Yojana and PM KUSUM, green hydrogen promotion, Renewable Economic Zones and Renewable Energy Manufacturing Zones, a green-energy university and skill centre, and single-window clearance. Acting through the Special Chief Secretary/Energy Department and invoking Section 108 of the Electricity Act 2003, GoAP wrote to the Commission proposing one proviso and asking that it be incorporated (p2).

The Commission records that it examined the proposal and, under s.181(1) read with ss.39(2)(d)(ii), 40(c), 42(2)–(4) and 86(1)(e), frames the amendment. Clause 1 gives the short title, extends the amendment to the whole State and brings it into force on Gazette publication. Clause 2 adds a proviso at the end of Clause 9.2 of the Principal Regulation, making the grant of grid connectivity for Clean Energy Projects, for the operative period mentioned in GO.Ms.No.37 dated 30.10.2024, dependent on the progress and recommendation of the State Nodal Agency (pp2–3). The text is signed at Kurnool on 26.03.2025 (p3).

Standard name
Open Access Regulations
Primary topics
Connectivity and GNA

Read with this

The regulation

Consolidated copies, for reference (1)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗