Second Amendment to the Andhra Pradesh Electricity Regulatory Commission (Terms and Conditions of Open Access) Regulation, 2005 (Regulation No. 2 of 2005)
Draft amendmentDated 26 Mar 2025
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the second amendment to APERC's 2005 Open Access Regulation. The opening pages set out the lineage of the instrument: the 2005 Principal Regulation (Regulation No. 2 of 2005), gazetted on 01.07.2005; its adoption by the newly constituted APERC for the residual State of Andhra Pradesh with effect from 01.08.2014 through the APERC (Adaptation) Regulation, 2014; and the first amendment (Regulation No. 1 of 2016) gazetted on 08.01.2016 (p1).
The trigger is the Government of Andhra Pradesh's Integrated Clean Energy (ICE) Policy, 2024, released on 16.10.2024, whose key features are summarised on pp1–2: an entire-value-chain and RE-manufacturing focus, the State's solar, wind and hybrid potential along with pumped storage, democratisation of generation through PM Surya Ghar Yojana and PM KUSUM, green hydrogen promotion, Renewable Economic Zones and Renewable Energy Manufacturing Zones, a green-energy university and skill centre, and single-window clearance. Acting through the Special Chief Secretary/Energy Department and invoking Section 108 of the Electricity Act 2003, GoAP wrote to the Commission proposing one proviso and asking that it be incorporated (p2).
The Commission records that it examined the proposal and, under s.181(1) read with ss.39(2)(d)(ii), 40(c), 42(2)–(4) and 86(1)(e), frames the amendment. Clause 1 gives the short title, extends the amendment to the whole State and brings it into force on Gazette publication. Clause 2 adds a proviso at the end of Clause 9.2 of the Principal Regulation, making the grant of grid connectivity for Clean Energy Projects, for the operative period mentioned in GO.Ms.No.37 dated 30.10.2024, dependent on the progress and recommendation of the State Nodal Agency (pp2–3). The text is signed at Kurnool on 26.03.2025 (p3).
Read with this
The regulation
- Published in the Gazette 1 Jul 2005Terms and Conditions of Open Access Regulation, 2005
Amendments and corrections
- Dated 8 Jan 2016Terms and Conditions of Open Access (First Amendment) Regulation, 2016
- Published in the Gazette 8 Jan 2016Terms and Conditions of Open Access Regulation, 2005 — First Amendment, 2016
Commencement notices and reasons
Consolidated copies, for reference (1)
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.