MERC · Maharashtra Electricity Regulatory Commission
Measures to Minimise Public Interface in View of COVID-19 — Practice Direction under the Supply Code, 2005 (2020)
MEASURES TO MINIMISE PUBLIC INTERFACE IN VIEW OF CORONAVIRUS EPIDEMIC (COVID-19)
CircularDated 26 Mar 2020
See that regulation for the date it took effect and for anything it keeps in force.
Made under a regulation Voltaic does not hold.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal anything done or action taken or purported to have been taken, or proceedings initiated under such repealed Regulations, shall be deemed to have been taken under this Code to the extent that same were not inconsistent with the Act; and 1.4.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
On 26 March 2020 the Maharashtra Electricity Regulatory Commission issued a practice direction telling distribution licensees how to handle consumer services during the COVID-19 epidemic (p1). The preamble records that electricity is an essential service exempted from movement restrictions, so continuity of supply must be maintained, but that metering, billing, bill collection and grievance handling all require public interface and are governed by the Supply Code Regulations, 2005 and the MERC SoP Regulations, 2014. TPC-D and AEML-D told the Commission they could not perform all mandated activities, so the Commission relaxed the Supply Code under Regulation 22 (p1–2).
The operative direction (p2, clauses a–f) keeps restoration-of-supply and safety complaints running, permits suspension of non-essential services that need visits to consumer premises — meter reading, billing, offline bill collection at payment centres, release of new connections — requires automated meter reading where available, estimated bills computed on an average basis and intimated digitally (email, SMS, app), facilitation of digital payment modes, and publicity through social, electronic and print media.
The direction remains in force only as long as the Government's COVID-19 restriction order is in force (p2).
Read with this
Voltaic does not hold the regulation itself.
Procedures and orders made under it
- Dated 28 Aug 2019Practice Direction — Expenses on Rising Mains and Floor Wise Metering in High Rise Buildings, 2019
- Dated 9 May 2020Billing of Consumers During COVID-19 Lockdown — Practice Direction, 2020
- Dated 21 May 2020Revision of Contract Demand in a Billing Cycle — Practice Direction, 2020
- Dated 31 Jul 2020Extension of Practice Direction dated 21 May 2020 — Revision of Contract Demand in a Billing Cycle, Electricity Supply Code and Other Conditions of Supply Regulations, 2005
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.