MERC · Maharashtra Electricity Regulatory Commission
Billing of Consumers During COVID-19 Lockdown — Practice Direction, 2020
CLARIFICATIONS RELATING TO BILLING OF CONSUMER DURING COVID-19 LOCKDOWN
OrderDated 9 May 2020
See that regulation for the date it took effect and for anything it keeps in force.
Made under a regulation Voltaic does not hold.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal anything done or action taken or purported to have been taken, or proceedings initiated under such repealed Regulations, shall be deemed to have been taken under this Code to the extent that same were not inconsistent with the Act; and 1.4.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a MERC Practice Direction issued on 9 May, 2020 (p1) telling distribution licensees how to bill consumers during the COVID-19 lockdown, in order to end the divergent billing practices the Commission observed across utilities and to remove ambiguity among consumers, especially in Mumbai where parallel licensees operate (p1). It is issued under Regulation 22 of the MERC (Electricity Supply Code and Other Conditions of Supply) Regulations, 2005 (p2) and builds on two earlier instruments: a Practice Direction of 26 March 2020 suspending meter reading and allowing average-consumption billing, and MYT orders of 30 March 2020 granting a fixed-charge moratorium to industrial and commercial consumers (p1).
Paragraph (a) characterises that moratorium as a deferral rather than a waiver: the deferred amount is recoverable in equal interest-free instalments over the following billing cycles, with a rebate for consumers who settle the whole amount at once (p2).
Paragraph (b) fixes the billing basis — actual meter reading where Automatic Meter Reading is available, otherwise average-consumption bills under the Supply Code, adjusted once actuals are known. It adds a token-amount billing rule for premises under lockdown, a holding charge payable by utilities on money recovered in excess, and a carrying cost on consumers where the average bill understates actual consumption, which consumers can avoid by paying more than the assessed bill voluntarily (p2).
Paragraph (c) scales down delayed payment charges where recovery is high, and requires DPC to be recomputed and any excess refunded with holding charge once actual consumption is billed (p2). Paragraph (d) leaves all other billing matters — prompt payment discount, digital-payment incentives and the like — unchanged (p2). Paragraph (e) permits utilities to fund further concessions out of their own return on equity or reserves (p3).
The direction remains valid only while the Government's COVID-19 restriction order is in force; no end date is printed (p3). It is signed by two Members (p3).
Read with this
Voltaic does not hold the regulation itself.
Procedures and orders made under it
- Dated 28 Aug 2019Practice Direction — Expenses on Rising Mains and Floor Wise Metering in High Rise Buildings, 2019
- Dated 26 Mar 2020Measures to Minimise Public Interface in View of COVID-19 — Practice Direction under the Supply Code, 2005 (2020)
- Dated 21 May 2020Revision of Contract Demand in a Billing Cycle — Practice Direction, 2020
- Dated 31 Jul 2020Extension of Practice Direction dated 21 May 2020 — Revision of Contract Demand in a Billing Cycle, Electricity Supply Code and Other Conditions of Supply Regulations, 2005
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.