MERC · Maharashtra Electricity Regulatory Commission
Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality Regulations, 2021
Maharashtra Electricity Regulatory Commission (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) Regulations, 2021.
RegulationDate not statedNo. MERC/Legal/2021/66
1 amendment to it is on Voltaic, dated 5 Jul 2024.
Summary
Summary written by software, from pages 1 to 32 of 79. Check the regulator's original before you rely on it.
This is the Maharashtra Electricity Regulatory Commission's 2021 Electricity Supply Code and Standards of Performance for Distribution Licensees including Power Quality, issued as No. MERC/Legal/2021/66 under several provisions of the Electricity Act, 2003 (p1). It applies to all distribution licensees, including deemed distribution licensees, and all consumers in Maharashtra, as well as persons exempted under Section 13 and cases of unauthorised supply/use (p2). It comes into force from Gazette notification. It repeals the 2005 Supply Code and the 2014 Standards of Performance Regulations, with savings for actions already taken (p1–2).
Chapters 1–2 set the title, scope, repeal, application and extensive definitions covering consumer classes, voltage levels, metering, demand, power-quality and reliability terms (p1–9). Chapter 3 prescribes systems of supply and consumer classification by voltage and contract demand, with provisos for higher/lower-voltage supply, express feeders, dedicated distribution facilities and agriculture HVDS tapping (p9–11).
Chapter 4 authorises recovery of charges for giving supply and for electricity supplied, linked to tariffs, surcharges and a Commission-approved Schedule of Charges; it covers EHT cost handling, temporary supply, DDF and supervision charges (p12–15). Chapter 5 specifies how applications are made, mandatory online submission in Urban Areas, documents, acknowledgement, deficiency handling, delayed-service compensation and connection-release timelines (p15–20). Chapter 6 covers inspection, service position, land/room for licensee equipment, sanction and metering of new connections (p20–22).
Chapter 7 treats the application form as an agreement, termination, final billing and contract-demand revision (p22–24). Chapters 8–9 restrict handling of licensee property and entry to consumer premises, with domestic-premises safeguards and inspection reporting (p24–25). Chapter 10 addresses theft and unauthorised use, assessment procedure, appeal deposit and preventive measures (p25–28). Chapter 11 requires consumer wiring to CEA safety standards (p28). Chapter 12 governs change of name and dues on premises (p28–29). Chapter 13 sets security-deposit principles, recalculations, refunds, interest and prepaid-meter treatment (p29–32). Chapter 14 lets licensees classify/reclassify consumers only within Commission-approved tariff categories (p32). Chapter 15 begins meter requirements, including smart/remote-reading meters, at p32.
Read with this
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
- Dated 1 Mar 2021Practice Directions under Supply Code and Standards of Performance Regulations, 2021
- Dated 26 May 2021Revision of Contract Demand in a Billing Cycle — Practice Direction, 2021
- Dated 26 Dec 2023Practice Directions under the Electricity Supply Code and Standards of Performance Regulations, 2021 — disclaimers on new-connection applications and electricity bills, 2023
- Dated 22 Jul 2024Practice Directions under the Electricity Supply Code and Standards of Performance Regulations, 2021 — 2024
Other copies of these documents (1)
5 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft, 1 copy in another language, 1 draft or notice on a draft not held as English text and 1 procedure or order made under it not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.