MERC · Maharashtra Electricity Regulatory Commission
Practice Direction — Expenses on Rising Mains and Floor Wise Metering in High Rise Buildings, 2019
EXPENSES ON RISING MAINS AND FLOOR WISE METERING IN HIGH RISE BUILDINGS
OrderDated 28 Aug 2019
See that regulation for the date it took effect and for anything it keeps in force.
Made under a regulation Voltaic does not hold.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal anything done or action taken or purported to have been taken, or proceedings initiated under such repealed Regulations, shall be deemed to have been taken under this Code to the extent that same were not inconsistent with the Act; and 1.4.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a short MERC Practice Direction, dated 28 August 2019, that settles who pays for rising mains and floor-wise metering in high-rise buildings in Maharashtra. It arises out of Case No. 61 of 2019, where the Commission was asked to decide which party should bear the comparatively higher cost of supplying electricity through a rising-mains arrangement (p1).
The preamble walks through the existing framework. Regulation 9 of the Supply Code makes the consumer responsible for wiring beyond the point of supply; the point of supply is defined as the outgoing terminals of the licensee's cutouts; and Regulation 5.2 requires the licensee to fix that point in agreement with the applicant, normally at an accessible location (pp1–2). Reading that against Regulation 36(3) of the CEA (Measures relating to Safety and Electric Supply) Regulations, 2010 — which requires an isolating device at the point of commencement of supply, fixed not more than 1.70 m above ground — the Commission concludes that in buildings over 15 metres the point of supply must be on the ground or first floor (pp2–3). Anything beyond that is the consumer's wiring.
The Commission then notes that developers normally build rising mains and similar utilities during construction and recover the cost in the flat price. If rising-main cost were also loaded into service connection charges, consumers would pay twice (p3). The operative direction therefore places the work and its cost on the developer or consumer, allows them either to build to licensee-approved specifications or to reimburse the licensee's actual expenses, and requires the rising main to be handed over to the licensee for operation and maintenance (p3).
Read with this
Voltaic does not hold the regulation itself.
Procedures and orders made under it
- Dated 26 Mar 2020Measures to Minimise Public Interface in View of COVID-19 — Practice Direction under the Supply Code, 2005 (2020)
- Dated 9 May 2020Billing of Consumers During COVID-19 Lockdown — Practice Direction, 2020
- Dated 21 May 2020Revision of Contract Demand in a Billing Cycle — Practice Direction, 2020
- Dated 31 Jul 2020Extension of Practice Direction dated 21 May 2020 — Revision of Contract Demand in a Billing Cycle, Electricity Supply Code and Other Conditions of Supply Regulations, 2005
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.