MERC · Maharashtra Electricity Regulatory Commission
Revision of Contract Demand in a Billing Cycle — Practice Direction, 2020
REVISION OF CONTRACT DEMAND IN A BILLING CYCLE
OrderDated 21 May 2020
See that regulation for the date it took effect and for anything it keeps in force.
Made under a regulation Voltaic does not hold.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal anything done or action taken or purported to have been taken, or proceedings initiated under such repealed Regulations, shall be deemed to have been taken under this Code to the extent that same were not inconsistent with the Act; and 1.4.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a four-page MERC Practice Direction issued on 21 May 2020 under Regulation 22 of the MERC (Electricity Supply Code and Other Conditions of Supply) Regulations, 2005, to give consumers temporary relief during the COVID-19 lockdown (p1). The preamble records that a group of consumers asked the Commission to allow revision of Contract Demand on multiple occasions within one billing cycle, that the matter was dealt with in the Commission's order in Case No. 82 of 2020 dated 21 May 2020, and that the Commission is invoking its power to issue Practice Directions (p1).
The preamble then sets out the position it is departing from: consumers must apply for revision; under the Standards of Performance Regulations, 2014 the Distribution Licensee must give effect to a complete application within the second billing cycle; and a Practice Direction of 5 December 2018 removed the requirement of executing an agreement for such revision, substituting online acceptance of terms (p1–2). It notes that while the regulations do not limit the number of revisions, the second-billing-cycle deadline has produced a practice of one revision per billing cycle, and that demand-linked bill components — demand charges, penalty for exceeding Contract Demand and Load Factor Incentive — are computed proportionately across the pre- and post-revision intervals (p2). It explains the difficulty industrial and commercial consumers face in projecting demand during the lockdown, and expects further requests to be for increases, which would raise licensee revenue (p2–3).
The operative direction (pp3–4) allows HT Industrial and HT Commercial consumers up to 3 revisions in a billing cycle, and LT Industrial and LT Commercial consumers on demand-based tariff up to 2; requires consumers to apply at least 3 days in advance; requires the licensee to grant revision from the requested date subject to technical feasibility; and prescribes proportionate computation of demand-linked bill components across revision intervals while all other components are billed for the full cycle. A proviso restricts the maximum Load Factor Incentive to 10% of energy charges — against 15% in the Tariff Order — for the remainder of the billing cycle after an HT consumer's third change, restored in the next cycle. Where AMR data is unavailable, the licensee must arrange MRI data or fall back on average billing, to be reconciled once the lockdown lifts (pp3–4). The direction is valid only till 31 July 2020 (p4).
Read with this
Voltaic does not hold the regulation itself.
Procedures and orders made under it
- Dated 28 Aug 2019Practice Direction — Expenses on Rising Mains and Floor Wise Metering in High Rise Buildings, 2019
- Dated 26 Mar 2020Measures to Minimise Public Interface in View of COVID-19 — Practice Direction under the Supply Code, 2005 (2020)
- Dated 9 May 2020Billing of Consumers During COVID-19 Lockdown — Practice Direction, 2020
- Dated 31 Jul 2020Extension of Practice Direction dated 21 May 2020 — Revision of Contract Demand in a Billing Cycle, Electricity Supply Code and Other Conditions of Supply Regulations, 2005
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.