Extension of Practice Direction dated 21 May 2020 — Revision of Contract Demand in a Billing Cycle, Electricity Supply Code and Other Conditions of Supply Regulations, 2005
EXTENSION OF PRACTICE DIRECTION DATED 21 May, 2020 REVISION OF CONTRACT DEMAND IN A BILLING CYCLE MERC (ELECTRICITY SUPPLY CODE AND OTHER CONDITIONS OF SUPPLY) REGULATIONS, 2005 (The Supply Code)
CircularDated 31 Jul 2020
See that regulation for the date it took effect and for anything it keeps in force.
Made under a regulation Voltaic does not hold.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal anything done or action taken or purported to have been taken, or proceedings initiated under such repealed Regulations, shall be deemed to have been taken under this Code to the extent that same were not inconsistent with the Act; and 1.4.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a one-page instrument by which the Maharashtra Electricity Regulatory Commission extends the life of its own Practice Direction of 21 May 2020 on revision of contract demand within a billing cycle (p1). Paragraph 1 recalls that the earlier direction, issued under Regulation 22 of the MERC (Electricity Supply Code and Other Conditions of Supply) Regulations, 2005, allowed HT and LT industrial and commercial consumers a capped number of contract-demand revisions per billing cycle, subject to conditions, and was to run only until 31 July 2020 (p1). Paragraph 2 records that consumers petitioned in Case No. 137 of 2020 and that the Commission's Order of 31 July 2020 accepted the need to support industrial and commercial consumers through the Covid-19 impact and a staged ramp-up of production (p1). Paragraph 3 accordingly extends the 21 May 2020 direction to 31 March 2021, with all other conditions unchanged (p1). Nothing else is altered; the substantive relief still sits in the May 2020 direction.
Read with this
Voltaic does not hold the regulation itself.
Procedures and orders made under it
- Dated 28 Aug 2019Practice Direction — Expenses on Rising Mains and Floor Wise Metering in High Rise Buildings, 2019
- Dated 26 Mar 2020Measures to Minimise Public Interface in View of COVID-19 — Practice Direction under the Supply Code, 2005 (2020)
- Dated 9 May 2020Billing of Consumers During COVID-19 Lockdown — Practice Direction, 2020
- Dated 21 May 2020Revision of Contract Demand in a Billing Cycle — Practice Direction, 2020