CERC · Central Electricity Regulatory Commission
Draft Connectivity and General Network Access Regulations, 2017 — Comment Deadline Extension Public Notice
Extension of date for seeking comments/suggestions on "Draft Central Electricity Regulatory Commission (Grant of Connectivity and General Network Access to the inter-State transmission system and other related matters) Regulations, 2017"
Notice extending the date for comments on a draftDated 14 Dec 2017L-1/229/2017-CERC dated 14th December, 2017
Draft
Voltaic holds no final regulation made from this draft.
Notice extending the date for comments on the Grant of Connectivity and General Network Access Regulations, 2017 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Central Electricity Regulatory Commission issued a one-page public notice on 14 December 2017 extending the deadline for stakeholder comments on the draft CERC (Grant of Connectivity and General Network Access to the inter-State transmission system and other related matters) Regulations, 2017 (p1). It recalls that comments were invited by an earlier public notice dated 14 November 2017, with the last date being 14 December 2017 (p1). After TPDDL, GMR and MB Power (MP) Limited requested more time, the Commission extended the last date for submissions to 14 January 2018 (p1). The notice does not change the draft regulations themselves; it only shifts the consultation deadline. It is signed by the Secretary (p1).
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Dated 14 Nov 2017Grant of Connectivity and General Network Access Regulations, 2017 — Draft
- Released with the notice dated 14 Nov 2017Explanatory memorandum: Draft Connectivity and GNA Regulations, 2017 — Explanatory Memorandum
- Released with the notice dated 14 Nov 2017Annexure or form: Connectivity and GNA Formats, 2017
- Dated 14 Nov 2017Public notice: Draft Connectivity and General Network Access to the inter-State Transmission System Regulations, 2017 — Public Notice
- Dated 2 Feb 2018Notice extending the date for comments: Draft Connectivity and General Network Access Regulations, 2017 — Extension of Comments Deadline
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.