Skip to content

CERC · Central Electricity Regulatory Commission

Draft Connectivity and General Network Access Regulations, 2017 — Comment Deadline Extension Public Notice

Extension of date for seeking comments/suggestions on "Draft Central Electricity Regulatory Commission (Grant of Connectivity and General Network Access to the inter-State transmission system and other related matters) Regulations, 2017"

Notice extending the date for comments on a draftDated 14 Dec 2017L-1/229/2017-CERC dated 14th December, 2017

Draft

Voltaic holds no final regulation made from this draft.

Notice extending the date for comments on the Grant of Connectivity and General Network Access Regulations, 2017 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Central Electricity Regulatory Commission issued a one-page public notice on 14 December 2017 extending the deadline for stakeholder comments on the draft CERC (Grant of Connectivity and General Network Access to the inter-State transmission system and other related matters) Regulations, 2017 (p1). It recalls that comments were invited by an earlier public notice dated 14 November 2017, with the last date being 14 December 2017 (p1). After TPDDL, GMR and MB Power (MP) Limited requested more time, the Commission extended the last date for submissions to 14 January 2018 (p1). The notice does not change the draft regulations themselves; it only shifts the consultation deadline. It is signed by the Secretary (p1).

Standard name
Connectivity and GNA Regulations

Read with this

Voltaic holds no final regulation made from this draft.

Proposed changes (drafts with no final yet)

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document