Draft Connectivity and General Network Access Regulations, 2017 — Extension of Comments Deadline

Extension of date for seeking comments/suggestions on "Draft Central Electricity Regulatory Commission (Grant of Connectivity and General Network Access to the inter-State transmission system and other related matters) Regulations, 2017"

Notice extending the date for comments on a draftDated 2 Feb 2018No. L-1/229/2017-CERC

Draft

Voltaic holds no final regulation made from this draft.

Notice extending the date for comments on the Grant of Connectivity and General Network Access Regulations, 2017 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-page public notice from the Central Electricity Regulatory Commission (CERC) dated 2 February 2018, issued under file number L-1/229/2017-CERC (p1). It concerns the consultation on the Draft CERC (Grant of Connectivity and General Network Access to the inter-State transmission system and other related matters) Regulations, 2017.

The notice recalls the consultation timeline: stakeholder comments were originally invited by 14.12.2017, and that last date was extended to 14.1.2018 at the request of some stakeholders (p1). It then records that RRVPNL, MPPMCL, UPPCL, UPTCL and MSEDCL asked for further time to furnish comments (p1).

Considering those requests, the Commission extends the last date for submission of comments/suggestions on the draft regulations to 28.02.2018 (p1). The notice is signed by the Secretary, Sanoj Kumar Jha. It creates no substantive rights or obligations and does not reproduce or modify the draft regulations themselves — it only moves the consultation deadline.

Standard name
Connectivity and GNA Regulations

Read with this

Voltaic holds no final regulation made from this draft.

Proposed changes (drafts with no final yet)

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document