CERC · Central Electricity Regulatory Commission
Draft Connectivity and General Network Access Regulations, 2017 — Extension of Comments Deadline
Extension of date for seeking comments/suggestions on "Draft Central Electricity Regulatory Commission (Grant of Connectivity and General Network Access to the inter-State transmission system and other related matters) Regulations, 2017"
Notice extending the date for comments on a draftDated 2 Feb 2018No. L-1/229/2017-CERC
Draft
Voltaic holds no final regulation made from this draft.
Notice extending the date for comments on the Grant of Connectivity and General Network Access Regulations, 2017 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a one-page public notice from the Central Electricity Regulatory Commission (CERC) dated 2 February 2018, issued under file number L-1/229/2017-CERC (p1). It concerns the consultation on the Draft CERC (Grant of Connectivity and General Network Access to the inter-State transmission system and other related matters) Regulations, 2017.
The notice recalls the consultation timeline: stakeholder comments were originally invited by 14.12.2017, and that last date was extended to 14.1.2018 at the request of some stakeholders (p1). It then records that RRVPNL, MPPMCL, UPPCL, UPTCL and MSEDCL asked for further time to furnish comments (p1).
Considering those requests, the Commission extends the last date for submission of comments/suggestions on the draft regulations to 28.02.2018 (p1). The notice is signed by the Secretary, Sanoj Kumar Jha. It creates no substantive rights or obligations and does not reproduce or modify the draft regulations themselves — it only moves the consultation deadline.
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Dated 14 Nov 2017Grant of Connectivity and General Network Access Regulations, 2017 — Draft
- Released with the notice dated 14 Nov 2017Explanatory memorandum: Draft Connectivity and GNA Regulations, 2017 — Explanatory Memorandum
- Released with the notice dated 14 Nov 2017Annexure or form: Connectivity and GNA Formats, 2017
- Dated 14 Nov 2017Public notice: Draft Connectivity and General Network Access to the inter-State Transmission System Regulations, 2017 — Public Notice
- Dated 14 Dec 2017Notice extending the date for comments: Draft Connectivity and General Network Access Regulations, 2017 — Comment Deadline Extension Public Notice
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.