CERC · Central Electricity Regulatory Commission

Connectivity and GNA Formats, 2017

Format

Annexure or form of a draftReleased with the notice dated 14 Nov 2017

Draft

Voltaic holds no final regulation made from this draft.

Annexure or form of the Grant of Connectivity and General Network Access Regulations, 2017 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This document is a compilation of the standard formats and model agreements that sit under the CERC (Grant of Connectivity, General Network Access to the inter-State transmission system and other related matters) Regulations, 2017. It is not the regulation itself; it supplies the paperwork an applicant, CTU, STU or connected generator is expected to use when seeking or granting connectivity and GNA to the ISTS.

The first part is procedural. FORMAT-A (p1) is a notarised affidavit affirming authority and the truth of the application. FORMAT-CON-1 (p2–5) is the application for connectivity or Stage-I connectivity, capturing applicant category, phased capacity and dates, location, installed capacity, commissioning schedule, fuel/source, generation and step-up voltage, nearest substations and documents enclosed. FORMAT-CON-2 (p6–8) is the parallel Stage-II application for renewable generators and solar/wind/wind-solar park developers, adding Stage-I details, financial closure, bid/PPA/PSA evidence, dedicated-line/switchgear/ICT progress and BG/LG details.

The model-agreement part follows. FORMAT-CON-3 (p9–28) is a model agreement between a lead generator and other generators in a geographically contiguous group seeking a single ISTS connection point. It covers appointment of the lead generator, duration, scope, shared common infrastructure, management committee, termination and default, insurance, confidentiality, publicity, notices, indemnity, arbitration and jurisdiction. FORMAT-CON-4 (p29–33) is a shorter model agreement between a principal generator and renewable generators connecting through the existing station's electrical system.

The CTU-side templates are FORMAT-CON-5 (p34–37) and FORMAT-CON-6 (p38–40), intimations of grant of Stage-I/connectivity and Stage-II connectivity, with notes on completion of dedicated transmission, connection agreement, infirm power, special protection schemes and switchyard ratings. FORMAT-CON-7 (p41–55) is the additional-information form for signing a connection agreement, with schedules for site maps, SLD, generating-unit ratings, fault and dynamic data, transformer data and excitation models. FORMAT-CON-8 (p56–60) is CTU's draft letter furnishing connection details, covering bay allocation, equipment, protection, SCADA, communication and site responsibility. FORMAT-CON-9 (p61–69) is the model connection agreement, covering charges, commissioning instructions, metering, site access, assignment, notices, disputes, confidentiality and amendment.

The GNA forms begin at p70. FORMAT-GNA-1 (p70–72) is the non-STU application for GNA; FORMAT-GNA-2 (p73–74) is the STU application on behalf of DISCOMs and intra-State entities, with year-wise/quarterly GNA data; FORMAT-GNA-3 (p75–77) is the STU no-objection certificate; FORMAT-GNA-4 (p78–81) is the access bank guarantee proforma. A second form numbered FORMAT-GNA-4 (p82–83) is the non-STU intimation of grant of GNA; FORMAT-GNA-6 (p84–85) is the STU intimation. FORMAT-GNA-7 (p86–98) is the model GNA agreement between CTU and GNA customers, with annexures on projects, transmission systems, charge sharing and staging, and a bank guarantee/letter of guarantee proforma at Annexure-X (p99–101). The compilation also carries consultation notes inviting stakeholder suggestions on the formats and on force majeure/change in law (p41, p93).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Payment security

Read with this

Voltaic holds no final regulation made from this draft.

Proposed changes (drafts with no final yet)

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.