CERC · Central Electricity Regulatory Commission
Connectivity and GNA Formats, 2017
Format
Annexure or form of a draftReleased with the notice dated 14 Nov 2017
Draft
Voltaic holds no final regulation made from this draft.
Annexure or form of the Grant of Connectivity and General Network Access Regulations, 2017 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This document is a compilation of the standard formats and model agreements that sit under the CERC (Grant of Connectivity, General Network Access to the inter-State transmission system and other related matters) Regulations, 2017. It is not the regulation itself; it supplies the paperwork an applicant, CTU, STU or connected generator is expected to use when seeking or granting connectivity and GNA to the ISTS.
The first part is procedural. FORMAT-A (p1) is a notarised affidavit affirming authority and the truth of the application. FORMAT-CON-1 (p2–5) is the application for connectivity or Stage-I connectivity, capturing applicant category, phased capacity and dates, location, installed capacity, commissioning schedule, fuel/source, generation and step-up voltage, nearest substations and documents enclosed. FORMAT-CON-2 (p6–8) is the parallel Stage-II application for renewable generators and solar/wind/wind-solar park developers, adding Stage-I details, financial closure, bid/PPA/PSA evidence, dedicated-line/switchgear/ICT progress and BG/LG details.
The model-agreement part follows. FORMAT-CON-3 (p9–28) is a model agreement between a lead generator and other generators in a geographically contiguous group seeking a single ISTS connection point. It covers appointment of the lead generator, duration, scope, shared common infrastructure, management committee, termination and default, insurance, confidentiality, publicity, notices, indemnity, arbitration and jurisdiction. FORMAT-CON-4 (p29–33) is a shorter model agreement between a principal generator and renewable generators connecting through the existing station's electrical system.
The CTU-side templates are FORMAT-CON-5 (p34–37) and FORMAT-CON-6 (p38–40), intimations of grant of Stage-I/connectivity and Stage-II connectivity, with notes on completion of dedicated transmission, connection agreement, infirm power, special protection schemes and switchyard ratings. FORMAT-CON-7 (p41–55) is the additional-information form for signing a connection agreement, with schedules for site maps, SLD, generating-unit ratings, fault and dynamic data, transformer data and excitation models. FORMAT-CON-8 (p56–60) is CTU's draft letter furnishing connection details, covering bay allocation, equipment, protection, SCADA, communication and site responsibility. FORMAT-CON-9 (p61–69) is the model connection agreement, covering charges, commissioning instructions, metering, site access, assignment, notices, disputes, confidentiality and amendment.
The GNA forms begin at p70. FORMAT-GNA-1 (p70–72) is the non-STU application for GNA; FORMAT-GNA-2 (p73–74) is the STU application on behalf of DISCOMs and intra-State entities, with year-wise/quarterly GNA data; FORMAT-GNA-3 (p75–77) is the STU no-objection certificate; FORMAT-GNA-4 (p78–81) is the access bank guarantee proforma. A second form numbered FORMAT-GNA-4 (p82–83) is the non-STU intimation of grant of GNA; FORMAT-GNA-6 (p84–85) is the STU intimation. FORMAT-GNA-7 (p86–98) is the model GNA agreement between CTU and GNA customers, with annexures on projects, transmission systems, charge sharing and staging, and a bank guarantee/letter of guarantee proforma at Annexure-X (p99–101). The compilation also carries consultation notes inviting stakeholder suggestions on the formats and on force majeure/change in law (p41, p93).
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Dated 14 Nov 2017Grant of Connectivity and General Network Access Regulations, 2017 — Draft
- Released with the notice dated 14 Nov 2017Explanatory memorandum: Draft Connectivity and GNA Regulations, 2017 — Explanatory Memorandum
- Dated 14 Nov 2017Public notice: Draft Connectivity and General Network Access to the inter-State Transmission System Regulations, 2017 — Public Notice
- Dated 14 Dec 2017Notice extending the date for comments: Draft Connectivity and General Network Access Regulations, 2017 — Comment Deadline Extension Public Notice
- Dated 2 Feb 2018Notice extending the date for comments: Draft Connectivity and General Network Access Regulations, 2017 — Extension of Comments Deadline