CERC · Central Electricity Regulatory Commission
Grant of Connectivity and General Network Access Regulations, 2017 — Draft
Central Electricity Regulatory Commission (Grant of Connectivity and General Network Access to the inter-State transmission system and other related matters) Regulations, 2017
Draft regulationDated 14 Nov 2017No. L-1/229/2017-CERC dated 14th November, 2017
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's draft notification, dated 14 November 2017 (p1), containing the proposed Central Electricity Regulatory Commission (Grant of Connectivity and General Network Access to the inter-State transmission system and other related matters) Regulations, 2017. It would replace the long-term access / medium-term open access regime with a single General Network Access (GNA) framework for the ISTS, administered by the Central Transmission Utility as nodal agency (Regs 3–4, p6). It comes into force on a date CERC is to notify (cl. 1.2, p1).
Chapter 1 (pp1–6) defines the regime's vocabulary — GNA, GNA customer, connectivity, access bank guarantee, lead and principal generators, the ATC/TTC/TRM family, and contract durations — and sets out who may apply for connectivity, by technology and size threshold (pp1–2). Chapter 2 (pp6–8) sets the scope, names CTU as nodal agency, prescribes application fees, and fixes processing timeframes with the fee returned if CTU misses them.
Chapter 3 (pp8–33) is the operative core: grant of connectivity, including a two-stage process for renewable generators and solar/wind park developers with milestone-based Stage-II eligibility and bank guarantees (Reg 7, pp9–14); construction, ownership and handover of dedicated transmission lines to CTU (Reg 8, pp17–18); metering point and interface meters (Regs 10, 13, pp18, 23); the GNA application process, access bank guarantee and priority queueing (Regs 11–12, 19); system studies producing TTC/ATC/TRM (Reg 14, pp23–25); regulatory approval of new ISTS assets (Reg 15, p25); GNA by generators and captive plants, PPA registration and scheduling priority (Regs 16–18, pp25–27); the GNA agreement, effective date and charge liability (Regs 21–22, p28); PPA termination, relinquishment and exit charges (Regs 23–24, pp29–30); and the transition from LTA, treatment of delays and charge sharing (Regs 25–28, pp30–33).
Chapter 5 (pp33–35) sets conditions on GNA — curtailment priority, sharing of transmission charges, the schedule of formats, RLDC/SLDC fees, deviation charges, corridor reservation for power exchanges and sale of surplus power by distribution licensees. Chapter 6 (pp35–36) gives CERC power to relax and to remove difficulties, and repeals the 2009 connectivity/LTA/MTOA regulations with savings. An indicative flow chart follows at p37.
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Released with the notice dated 14 Nov 2017Explanatory memorandum: Draft Connectivity and GNA Regulations, 2017 — Explanatory Memorandum
- Released with the notice dated 14 Nov 2017Annexure or form: Connectivity and GNA Formats, 2017
- Dated 14 Nov 2017Public notice: Draft Connectivity and General Network Access to the inter-State Transmission System Regulations, 2017 — Public Notice
- Dated 14 Dec 2017Notice extending the date for comments: Draft Connectivity and General Network Access Regulations, 2017 — Comment Deadline Extension Public Notice
- Dated 2 Feb 2018Notice extending the date for comments: Draft Connectivity and General Network Access Regulations, 2017 — Extension of Comments Deadline
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.