CERC · Central Electricity Regulatory Commission
Draft Connectivity and General Network Access to the inter-State Transmission System Regulations, 2017 — Public Notice
Draft Central Electricity Regulatory Commission (Grant of Connectivity and General Network Access to the inter-State transmission system and other related matters) Regulations, 2017
Public notice on a draftDated 14 Nov 2017No. L-1/229/2017-CERC dated 14th November, 2017
Draft
Voltaic holds no final regulation made from this draft.
Public notice on the Grant of Connectivity and General Network Access Regulations, 2017 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Central Electricity Regulatory Commission has issued a one-page public notice (p1) stating that it has made the Draft Central Electricity Regulatory Commission (Grant of Connectivity and General Network Access to the inter-State transmission system and other related matters) Regulations, 2017 (p1). The notice is given under Section 178 of the Electricity Act, 2003 read with the Electricity (Procedure for Previous Publications) Rules, 2005, and invites comments, suggestions and objections on the draft (p1).
Submissions are to reach the Secretary by 14 December 2017; comments arriving after that date may not be considered when the regulations are finalised (p1). The draft regulations and an accompanying Explanatory Memorandum are annexed and can also be downloaded from the Commission's website (p1). The notice itself carries no substantive regulatory content — the operative text sits in the annexures it points to.
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Dated 14 Nov 2017Grant of Connectivity and General Network Access Regulations, 2017 — Draft
- Released with the notice dated 14 Nov 2017Explanatory memorandum: Draft Connectivity and GNA Regulations, 2017 — Explanatory Memorandum
- Released with the notice dated 14 Nov 2017Annexure or form: Connectivity and GNA Formats, 2017
- Dated 14 Dec 2017Notice extending the date for comments: Draft Connectivity and General Network Access Regulations, 2017 — Comment Deadline Extension Public Notice
- Dated 2 Feb 2018Notice extending the date for comments: Draft Connectivity and General Network Access Regulations, 2017 — Extension of Comments Deadline
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.