Skip to content

CERC · Central Electricity Regulatory Commission

Draft Connectivity and General Network Access to the inter-State Transmission System Regulations, 2017 — Public Notice

Draft Central Electricity Regulatory Commission (Grant of Connectivity and General Network Access to the inter-State transmission system and other related matters) Regulations, 2017

Public notice on a draftDated 14 Nov 2017No. L-1/229/2017-CERC dated 14th November, 2017

Draft

Voltaic holds no final regulation made from this draft.

Public notice on the Grant of Connectivity and General Network Access Regulations, 2017 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Central Electricity Regulatory Commission has issued a one-page public notice (p1) stating that it has made the Draft Central Electricity Regulatory Commission (Grant of Connectivity and General Network Access to the inter-State transmission system and other related matters) Regulations, 2017 (p1). The notice is given under Section 178 of the Electricity Act, 2003 read with the Electricity (Procedure for Previous Publications) Rules, 2005, and invites comments, suggestions and objections on the draft (p1).

Submissions are to reach the Secretary by 14 December 2017; comments arriving after that date may not be considered when the regulations are finalised (p1). The draft regulations and an accompanying Explanatory Memorandum are annexed and can also be downloaded from the Commission's website (p1). The notice itself carries no substantive regulatory content — the operative text sits in the annexures it points to.

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA

Read with this

Voltaic holds no final regulation made from this draft.

Proposed changes (drafts with no final yet)

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document