CERC · Central Electricity Regulatory Commission
Draft Connectivity and GNA Regulations, 2017 — Explanatory Memorandum
Draft Central Electricity Regulatory Commission (Connectivity, General Network Access to the inter-State transmission system and other related matters) Regulations, 2017
Explanatory memorandum to a draftReleased with the notice dated 14 Nov 2017
Draft
Voltaic holds no final regulation made from this draft.
Explanatory memorandum to the Grant of Connectivity and General Network Access Regulations, 2017 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is CERC's Explanatory Memorandum to its Draft Central Electricity Regulatory Commission (Connectivity, General Network Access to the inter-State transmission system and other related matters) Regulations, 2017 (p1). It is a consultation document, not the regulation itself: it explains what the proposed General Network Access (GNA) regime would change, whom it would catch, and where the Commission is still asking for stakeholder views. No issue date or commencement date is printed.
Background (paras 1.1–1.9, pp1–3) traces the review from the 2009 Connectivity Regulations and the 2010 Sharing Regulations, through the September 2014 Staff Paper and the 2015 Task Force on transmission planning, to the Committee under Shri Mata Prasad whose September 2016 report supplies most of the recommendations reproduced in the memorandum; it also points to the parallel draft CERC (Transmission Planning and other related matters) Regulations, 2017.
The first block of salient features (paras 2.1–2.5, pp3–24) sets out who may apply for connectivity and for GNA, proposes a Central Repository of generation projects maintained by CEA with periodic reporting formats, extends eligibility to entities already connected to a State grid and to dual State/ISTS connection, replaces the prevailing application fee with slab-based non-refundable fees (exempting STUs), and requires STUs to forecast State injection/withdrawal GNA on a rolling five-year horizon at each ISTS interconnection point, with a CTU/CEA/POSOCO fallback and validation machinery where a State cannot assess its requirement. For renewable stations and solar/wind/wind-solar park developers it creates a two-stage connectivity process with milestones and a bank guarantee at Stage-II, partly carrying forward the Commission's September 2017 order on wind connectivity.
The middle block (paras 2.6–2.18, pp24–48) keeps connectivity a distinct product separate from GNA, states the quantum and prerequisites for applying, places construction of dedicated transmission lines on the generator (with sharing among generators and handover to CTU for operation), defines the start date of connectivity and the metering point, sets the injection-GNA regime for generating stations and captive plants (quantum, phasing, lead time before commissioning), and provides for PPA registration, scheduling priority by contract tenure, and State-wise scheduling and curtailment when a corridor is constrained. It also covers the GNA Agreement, curtailment after the day-ahead schedule, the date GNA is operationalised and liability for transmission charges from that date, and intimation of PPA termination.
The last block (paras 2.19–2.30, pp48–64) deals with sharing of transmission charges under the Sharing Regulations — including the margin allowed over a State's withdrawal GNA before additional charges — the transition from existing LTA/MTOA to GNA, the Access Bank Guarantee and its progressive release, exit and downscaling charges, treatment of delay on the generation and transmission sides, upstream/downstream commissioning mismatch, reservation of corridor for power-exchange transactions, and sale of surplus power (including a State's ISGS share) at the injection point.
The document closes with two quarterly progress report formats — one for thermal (including captive) and hydro stations, one for renewable stations and park developers (pp65–67) — which appear to be the Central Repository monitoring formats referred to in para 2.2.5 (p9).
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Dated 14 Nov 2017Grant of Connectivity and General Network Access Regulations, 2017 — Draft
- Released with the notice dated 14 Nov 2017Annexure or form: Connectivity and GNA Formats, 2017
- Dated 14 Nov 2017Public notice: Draft Connectivity and General Network Access to the inter-State Transmission System Regulations, 2017 — Public Notice
- Dated 14 Dec 2017Notice extending the date for comments: Draft Connectivity and General Network Access Regulations, 2017 — Comment Deadline Extension Public Notice
- Dated 2 Feb 2018Notice extending the date for comments: Draft Connectivity and General Network Access Regulations, 2017 — Extension of Comments Deadline
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.