PSERC · Punjab State Electricity Regulatory Commission
Grid Interactive Rooftop Solar Photo Voltaic Systems Regulations, 2021
Punjab State Electricity Regulatory Commission (Grid Interactive Rooftop Solar Photo Voltaic Systems) Regulations, 2021
RegulationDated 18 Aug 2021Published in the Gazette 18 Aug 2021No.PSERC/Secy./Regu.158.- dated The 18th August, 2021
3 amendments to it are on Voltaic, the latest dated 7 Apr 2026.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Punjab State Electricity Regulatory Commission's principal regulation for grid-connected rooftop solar, notified in the official Gazette on 18 August 2021 (p1) and in force from that publication date. It replaces a net-metering-only regime with three commercial arrangements — net metering, net billing (net feed-in) and gross metering — of which a consumer may opt for only one (p3–4, 6–7).
Regulation 2 (p1–3) fixes the working vocabulary: prosumer, eligible consumer, net metering, net billing, gross metering, settlement period, RESCO and REC, among others. Regulations 3–5 set scope and eligibility: all three arrangements, applications received on or after notification, capacity ceilings tied to sanctioned load or contract demand, a net-metering ceiling of 500 kWp, minimum sizes of 1 kWp for net metering/net billing and 50 kWp for gross metering (p4), and a licensee-level capacity cap driven by a Commission-determined target and by a share of distribution transformer/feeder capacity (p5).
Regulations 6–7 cover interconnection, safety and metering: CEA connectivity, safety and metering standards apply, anti-islanding protection and harmonic limits are required, and the distribution licensee installs and maintains a bi-directional meter plus a generation meter at the consumer's cost, with a check meter in the gross-metering case (p5–6).
Regulations 8–11 describe the three arrangements and the application route — a web-based process, published procedures and empanelled vendors, processing and extension fees, application-tracking, and a timetable in which missed licensee deadlines result in deemed approval (p6–9).
Regulations 12–15 are the commercial core: billing-cycle disclosures, energy accounting and carry-forward for net metering (with a settlement-period generation cap and surplus treated as inadvertent injection), the net-billing bill equation and billing-credit carry-forward, gross-metering invoicing, and accounting when a meter fails (p9–12). Regulation 16 exempts these systems from wheeling, cross-subsidy, transmission, distribution and banking charges; 17–18 tie them to REC eligibility and RPO compliance (p12). Regulations 19–21 provide compensation for licensee delay, consequences of over-capacity or unapproved parallel operation, dispute resolution through the Forum and Ombudsman route, and agreement termination (p12–13). Regulations 22–26 are the standard powers — practice directions, removal of difficulties, relaxation, amendment — and the repeal of the 2015 regulations with a saving for already-registered systems (p13).
Read with this
Amendments and corrections
- Dated 11 Mar 2024Grid Interactive Rooftop Solar Photo Voltaic Systems Regulations, 2021 — 1st Amendment, 2024
- Dated 20 Feb 2025Grid Interactive Rooftop Solar Photo Voltaic Systems Regulations, 2021 — Second Amendment, 2025
- Dated 7 Apr 2026Grid Interactive Rooftop Solar PV Regulations, 2026 — 3rd Amendment
Procedures and orders made under it
Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of PSERC's website on 26 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.