PSERC · Punjab State Electricity Regulatory Commission

Grid Interactive Rooftop Solar Photo Voltaic Systems, 2021 — 3rd Amendment, 2026 — Order

Punjab State Electricity Regulatory Commission (Grid Interactive Rooftop Solar Photo Voltaic Systems) (3rd Amendment) Regulations, 2026

OrderDated 7 Apr 2026

Made under the Grid Interactive Rooftop Solar Photo Voltaic Systems Regulations, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This order records the Commission's decisions on objections to the draft Third Amendment of the PSERC (Grid Interactive Rooftop Solar Photo Voltaic Systems) Regulations, 2021 and approves those amendment regulations (p1, p29). After a public notice, a hearing on 04.02.2026 and written objections from four objectors — two individuals, the Military Engineer Services and PSPCL — the order works clause by clause through the draft, setting out the proposed text, PSPCL's objection and the Commission's decision (p1–29). Each numbered section corresponds to a regulation of the principal regulations being added or substituted.

The order adds new definitions — behind-the-meter, group net metering, the interconnection point for gross metering and VNM, and the participating consumer (p1–4) — substitutes the scope and application regulation to list the six metering arrangements and to lay down rules for RESCO contracts and consumer–RESCO disputes (p4–6), and restates the eligible-consumer and capacity limits for each arrangement (p6–11). It fixes the interconnection voltage by reference to the Supply Code, 2024, with a proviso for VNM (p12); sets metering, check-meter and cost-allocation rules (p12–14); and covers processing fee and who bears distribution system upgradation (p14–15).

Energy accounting and settlement is the largest block (p15–22): crediting of unadjusted surplus at a share of feed-in tariff, payment timelines and interest for delay, reset of carried-forward energy, monthly reading cycles for GNM and VNM, treatment of generation for disconnected connections as inadvertent injection, and a dues bar on VNM participants.

Several objections are rejected — treating BTM as captive, AC-side inverter capacity, kVAh metering, higher gross-metering caps, a doubled penalty, a site-specific defence establishment case and subsidy-related suggestions (p7, 17, 23–25, 27–29). The GNM and VNM provisions are to take effect from 01.07.2026 to match the licensee's billing system rollout (p29).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Metering, Billing and payment

Read with this

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document