Grid Interactive Rooftop Solar Photo Voltaic Systems Regulations, 2021 — Second Amendment, 2025

Punjab State Electricity Regulatory Commission (Grid Interactive Rooftop Solar Photo Voltaic Systems) (Second Amendment) Regulations, 2025

AmendmentDated 20 Feb 2025Published in the Gazette 24 Feb 2025No. PSERC/Secy./Regu. 193 dated The 20th February, 2025

Amends the Grid Interactive Rooftop Solar Photo Voltaic Systems Regulations, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A three-page PSERC notification substituting five regulations of the Commission's 2021 rooftop solar regulations. Notification No. PSERC/Secy./Regu. 193 is dated 20 February 2025 and appears in the Punjab Government Gazette (Extraordinary) of 24 February 2025; it takes effect on gazette publication (p1).

Regulation 11.5 is replaced to fix a deadline for the distribution licensee's technical feasibility study after acknowledging an application, and to deem complete applications for rooftop systems up to 10 kW accepted without a feasibility study, with any consequent sanctioned-load enhancement charged to the consumer under the Supply Code, 2024 (p1). Regulation 11.9 is replaced so that distribution-infrastructure upgrades needed for a rooftop installation — service-line augmentation, distribution transformer capacity and similar — are carried out by the licensee, with the cost recovered through its Annual Revenue Requirement (p1–2). Regulation 11.13 sets the post-installation sequence: signing of a connection agreement of up to 25 years, installation and sealing of the bi-directional or unidirectional generation meter, and commissioning, all within a stated period after the installation certificate (p2).

Regulation 14 is substituted as a gross-metering settlement regime: consumption billed at the applicable retail tariff, generation at the Commission-approved feed-in tariff, a single invoice for the net amount, carry-forward of amounts owed to the prosumer without interest until the end of the settlement period, payment within 30 days thereafter, and SBI MCLR interest on delay (p2). Regulation 15 replaces meter-defect accounting — reporting, meter replacement per the Supply Code, 2024, estimation from the check meter, and a fallback to the corresponding period of the previous year (p2–3). A closing note records the Principal Regulations and their first amendment (p3).

Standard name
Net Metering and Rooftop Solar
Primary topics
Gross metering, Metering, New connections and load changes

Read with this

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗