PSERC · Punjab State Electricity Regulatory Commission
Grid Interactive Rooftop Solar Photo Voltaic Systems Regulations, 2021 — 1st Amendment, 2024
Punjab State Electricity Regulatory Commission (Grid Interactive Rooftop Solar Photo Voltaic Systems) (1st amendment) Regulations, 2024
AmendmentDated 11 Mar 2024Published in the Gazette 11 Mar 2024PSERC/Secy./Regu.186.- dated The 11th March, 2024
Amends the Grid Interactive Rooftop Solar Photo Voltaic Systems Regulations, 2021.
Summary
Summary written by software. Check the regulator's original before you rely on it.
PSERC's 1st amendment to its 2021 Grid Interactive Rooftop Solar PV Regulations does one narrow thing: it rewrites the definition of "Settlement Period" and extends the revised period to systems already in place (p1–2).
Regulation 2 (p1) substitutes Regulation 2(za) of the Principal Regulations, splitting the annual settlement period into two tracks — a general window running from 1 October to 30 September, and a separate window from 1 April to 31 March for consumers defined as seasonal industry in the Commission's General Conditions of Tariff, namely cotton ginning, pressing and baling plants, rice shellers, rice bran stabilisation units without T.G. sets, and kinnow grading and waxing centres.
Regulation 3 (p1–2) inserts two provisos after the first proviso in Regulation 3.3 of the Principal Regulations. The first makes the revised settlement period apply not only to new rooftop solar systems but also to those already commissioned, and to applications received, on or before this notification — giving it retrospective reach. The second extends the current settlement period of rooftop systems belonging to seasonal industrial consumers, otherwise due to end on 30.09.2024, to 31 March 2025, aligning them with the new seasonal window.
Regulation 1 (p1) gives the short title, extends the amendment to the whole of Punjab and brings it into force from the date of publication in the State Gazette; the Gazette is dated 11 March 2024. The closing Note (p2) records the Principal Regulations' 2021 notification number and date.
Read with this
The regulation
Amendments and corrections
Procedures and orders made under it
Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.