Summary
Summary written by software. Check the regulator's original before you rely on it.
The Punjab State Electricity Regulatory Commission's Third Amendment to its 2021 Grid Interactive Rooftop Solar PV Regulations, notified 7 April 2026 and published in the Punjab Government Gazette on 11 April 2026, rewrites the definitions, eligible arrangements, capacity bands and settlement mechanics of the state's rooftop solar framework (p1). It comes into force on gazette publication, except the Group Net Metering and Virtual Net Metering provisions, which take effect on 1 July 2026 (p1).
Paragraph 2 recasts the definitions in Regulation 2: it adds 'Behind the Meter', 'Group Net Metering', 'Virtual Net Metering', 'Parent Consumer', 'Participating Consumer/Beneficiary', 'Participating Connections' and 'Third Party Owner', and replaces the definitions of Eligible Consumer, Interconnection Point, Sanctioned/Contracted Load and Supply Code (p1–3). Interconnection points are defined separately for net metering/net billing/GNM, for gross metering and for VNM, each with HT-specific provisos.
Paragraphs 3 and 4 replace Regulations 3 and 4: six permitted arrangements (net metering, net billing, GNM, gross metering, VNM and behind-the-meter), a rule that a consumer may opt for only one, rules on RESCO contracts and on which disputes the licensee stays out of, non-discriminatory transformer- or feeder-wise first-come-first-serve allocation, and minimum/maximum system capacity bands for each arrangement (p4–6).
Paragraph 5 amends Regulation 6 on interconnection voltage, CEA safety conformity, operation-and-maintenance responsibility and inverter harmonic limits; paragraph 6 amends Regulation 7 on bi-directional and generation meters, check meters and meter testing fees (p6–7). Paragraph 7 inserts Regulations 10A–10C describing the GNM, VNM and behind-the-meter arrangements; paragraph 8 adds provisos on processing fees and on who bears distribution-system upgradation cost; paragraphs 9 and 10 amend settlement of unadjusted credits and billing-credit carry-forward (p7–9).
Paragraph 11 inserts Regulations 14A–14C, the operational core: monthly meter reading, allocation of credits among participating connections on a declared priority and ratio, time-of-day treatment, carry-forward within the settlement period, payment of residual credits, handling of disconnections, exemption from banking, cross-subsidy and additional surcharge with wheeling charges and losses on participating connections, and the behind-the-meter regime with its capacity limit, no-injection rule and inadvertent-injection treatment (p9–14). A closing note lists the principal regulations and the first two amendments (p14).
Read with this
The regulation
Amendments and corrections
Procedures and orders made under it