PSERC · Punjab State Electricity Regulatory Commission

Grid Interactive Rooftop Solar Photo Voltaic Systems Regulations, 2021 — Order on Objections

PSERC (Grid Interactive Rooftop Solar Photo Voltaic Systems) Regulations, 2021

OrderDated 16 Aug 2021

Made under the Grid Interactive Rooftop Solar Photo Voltaic Systems Regulations, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Punjab State Electricity Regulatory Commission's order dated 16.08.2021 disposing of stakeholder objections to the draft PSERC (Grid Interactive Rooftop Solar Photo Voltaic Systems) Regulations, 2021 and approving those Regulations with modifications (p1, p37). It is not a consolidated regulation text: the operative provisions are quoted only where the Commission changed them.

The order opens with the background — the 2015 net-metering regulations, the Forum of Regulators' updated model regulations, and the Electricity (Rights of Consumers) Rules 2020 and Amendment Rules 2021 — plus the consultation record of 13 comments and a public hearing on 20.07.2021 (pp1–2).

The bulk is regulation-by-regulation reasoning: each objection is summarised, PSPCL's position recorded, and the Commission's decision given. The Regulations come into force from Gazette publication and apply prospectively to applications received on or after notification, with no transition period; a new proviso extends them to capacity-enhancement applications by existing consumers, while applications already registered stay under the 2015 Regulations (pp2, 6–7). Regulation 4 is rewritten to set category-wise capacity caps, a net-metering ceiling of 500 kWp, minimum project sizes and a permitted tolerance in rated capacity (pp12–16). Regulation 5 caps cumulative rooftop capacity on a distribution transformer/feeder and requires periodic publication of available capacity (pp16–18). Regulations 6 and 7 tighten interconnection, synchronisation, harmonic and metering requirements, including a check meter under gross metering (pp18–22). Regulation 8 is re-aligned with Regulation 4 (pp22–24). Application and registration timelines in Regulation 11 are upheld against PSPCL's plea for longer periods, with a time-bound network upgradation obligation carrying deemed approval (pp25–29). Regulation 12 introduces a ceiling on generation relative to consumption over each settlement period, bars payment for excess injection, and confirms the 1 October–30 September settlement period; Regulations 13 and 14 clarify billing credit carry-forward and single invoicing (pp29–34). A new Regulation 16 grants broad charge exemptions (pp34–35), and new penalty provisions address over-capacity installation and unapproved parallel operation (pp35–37). Group net metering, virtual net metering, behind-the-meter projects and banking charges are expressly deferred (pp5–6, 30–32).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Metering, Technical standards

Read with this

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document