PSERC · Punjab State Electricity Regulatory Commission
Harnessing of Captive Power Generation (1st Amendment) Regulations, 2026 — Order
Punjab State Electricity Regulatory Commission (Harnessing of Captive Power Generation) (1 st Amendment) Regulations, 2026
OrderDated 18 May 2026
Read with the Harnessing of Captive Power Generation Regulations, 2022.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Commission's order approving the Punjab State Electricity Regulatory Commission (Harnessing of Captive Power Generation) (1st Amendment) Regulations, 2026, which substitute Regulation 11 (Banking of Energy) of the Principal Regulations, 2022 notified on 27.10.2022 vide notification no. PSERC/Secy./Regu.166 (p1, p12).
The substituted Regulation 11 (pp1–2) makes banking available to a captive user drawing power from a renewable-energy-based captive generating plant connected to the intra-state transmission and/or distribution system, under a banking agreement with the distribution licensee on the terms of the PSERC (Terms and Conditions for Intra-State Open Access) Regulations, 2011, and bars use of banked energy for third-party sale. Where the CGP or captive user fails to satisfy the captive-status conditions in Rule 3 of the Electricity Rules, 2005 at the close of the financial year, the energy banked and utilised is treated as infirm power accounted for under Regulation 5.2, and grid drawal is charged at the tariff for the relevant consumer category.
The bulk of the order is the consultation record. Pages 2–5 set out the objections of Bluesky NRG Pvt. Ltd. and Madhav KRG Ltd. (clubbed as they are identical), arguing that the fail-out provisions impose multiple financial consequences for a single, possibly technical, non-compliance, and asking for a single penalty, an undertaking instead of a bank guarantee, permission to draw banked power during plant shutdowns, and quarterly verification of Rule 3 compliance. Pages 5–6 record the Commission's decision: those points concern the Principal Regulations and the Rule 3 criteria, not this amendment, whose purpose is to align settlement of banked energy with the settlement period in the Open Access Regulations and avoid duplication.
Pages 6–12 record the objection of the Steel Furnace Association of India (Punjab Chapter), which supports removing banking details from the Captive Power Regulations but contends the consequence of losing captive status should be withdrawal of the cross-subsidy surcharge, additional surcharge and electricity duty/IDF exemptions, not treating scheduled banked power as infirm or dumped; the Commission disposes of it by cross-reference to its earlier reasoning (p12).
Read with this
The regulation
- Dated 27 Oct 2022Harnessing of Captive Power Generation Regulations, 2022
Amendments and corrections
Procedures and orders made under it