Harnessing of Captive Power Generation (1st Amendment) Regulations, 2026 — Order

Punjab State Electricity Regulatory Commission (Harnessing of Captive Power Generation) (1 st Amendment) Regulations, 2026

OrderDated 18 May 2026

Read with the Harnessing of Captive Power Generation Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Commission's order approving the Punjab State Electricity Regulatory Commission (Harnessing of Captive Power Generation) (1st Amendment) Regulations, 2026, which substitute Regulation 11 (Banking of Energy) of the Principal Regulations, 2022 notified on 27.10.2022 vide notification no. PSERC/Secy./Regu.166 (p1, p12).

The substituted Regulation 11 (pp1–2) makes banking available to a captive user drawing power from a renewable-energy-based captive generating plant connected to the intra-state transmission and/or distribution system, under a banking agreement with the distribution licensee on the terms of the PSERC (Terms and Conditions for Intra-State Open Access) Regulations, 2011, and bars use of banked energy for third-party sale. Where the CGP or captive user fails to satisfy the captive-status conditions in Rule 3 of the Electricity Rules, 2005 at the close of the financial year, the energy banked and utilised is treated as infirm power accounted for under Regulation 5.2, and grid drawal is charged at the tariff for the relevant consumer category.

The bulk of the order is the consultation record. Pages 2–5 set out the objections of Bluesky NRG Pvt. Ltd. and Madhav KRG Ltd. (clubbed as they are identical), arguing that the fail-out provisions impose multiple financial consequences for a single, possibly technical, non-compliance, and asking for a single penalty, an undertaking instead of a bank guarantee, permission to draw banked power during plant shutdowns, and quarterly verification of Rule 3 compliance. Pages 5–6 record the Commission's decision: those points concern the Principal Regulations and the Rule 3 criteria, not this amendment, whose purpose is to align settlement of banked energy with the settlement period in the Open Access Regulations and avoid duplication.

Pages 6–12 record the objection of the Steel Furnace Association of India (Punjab Chapter), which supports removing banking details from the Captive Power Regulations but contends the consequence of losing captive status should be withdrawal of the cross-subsidy surcharge, additional surcharge and electricity duty/IDF exemptions, not treating scheduled banked power as infirm or dumped; the Commission disposes of it by cross-reference to its earlier reasoning (p12).

Standard name
Captive Generation Regulations
Primary topics
Energy banking, Captive status, Open access

Read with this

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document