This is the Punjab State Electricity Regulatory Commission's order on Petition No. 47 of 2022, filed by Punjab State Power Corporation Ltd (PSPCL), approving the procedure for determining whether a generating plant qualifies as a captive generating plant (p1).
Pages 1–4 set out the procedural history: the petition was admitted and heard in 2022, deferred pending the Commission's Captive Power Generation Regulations, then re-notified as PSERC (Harnessing of Captive Power Generation) Regulations, 2022 (p1). PSPCL's draft procedure was put through repeated public notices and hearings (pp2–4). The Commission then recorded nine issues with the draft, all turning on conformity with Rule 3 of the Electricity Rules, 2005 and APTEL's order of 07.06.2021 in Appeal No. 131 of 2020 — chiefly that captive status is verified annually at the close of the financial year rather than at the grant of open access, that documents demanded at open-access stage exceed what the Intra-State Open Access Regulations require, and that the treatment of SPVs, proportional consumption and mid-year shareholding changes diverged from the Tribunal (pp2–3).
Pages 4–9 reproduce the sole stakeholder objection (Reliance Industries Ltd) and PSPCL's responses — on the "not less than 51%" wording, the scope of the proportionality test, open access timelines, the bank guarantee, and the ten-day shareholding intimation requirement.
Pages 9–12 are the Commission's findings and order: it summarises the Forum of Regulators process and the APTEL findings, decides that verification happens at year-end with the distribution licensee reporting to the Commission, preserves the security deposit in the form of BG/LC/FD, allows the CGP or captive user to approach the Commission against the licensee's findings, and records the Ministry of Power's designation of the Central Electricity Authority as verification authority for inter-state cases (pp9–12). The approved procedure itself is a separate linked document (p12) and is expressly subject to the final interpretation of Rule 3 by the courts.
Read with this
The regulation
- Dated 27 Oct 2022Harnessing of Captive Power Generation Regulations, 2022
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.