PSERC · Punjab State Electricity Regulatory Commission

Order approving the Procedure for Determination of Captive Power Status, 2023

Petition under Section 86 of the Electricity Act, 2003, seeking Approval of the Procedure for determination of Captive Power Status.

ProcedureDated 7 May 2023Petition No. 47 of 2022 dated 07.05.2023

Made under the Harnessing of Captive Power Generation Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Punjab State Electricity Regulatory Commission's order on Petition No. 47 of 2022, filed by Punjab State Power Corporation Ltd (PSPCL), approving the procedure for determining whether a generating plant qualifies as a captive generating plant (p1).

Pages 1–4 set out the procedural history: the petition was admitted and heard in 2022, deferred pending the Commission's Captive Power Generation Regulations, then re-notified as PSERC (Harnessing of Captive Power Generation) Regulations, 2022 (p1). PSPCL's draft procedure was put through repeated public notices and hearings (pp2–4). The Commission then recorded nine issues with the draft, all turning on conformity with Rule 3 of the Electricity Rules, 2005 and APTEL's order of 07.06.2021 in Appeal No. 131 of 2020 — chiefly that captive status is verified annually at the close of the financial year rather than at the grant of open access, that documents demanded at open-access stage exceed what the Intra-State Open Access Regulations require, and that the treatment of SPVs, proportional consumption and mid-year shareholding changes diverged from the Tribunal (pp2–3).

Pages 4–9 reproduce the sole stakeholder objection (Reliance Industries Ltd) and PSPCL's responses — on the "not less than 51%" wording, the scope of the proportionality test, open access timelines, the bank guarantee, and the ten-day shareholding intimation requirement.

Pages 9–12 are the Commission's findings and order: it summarises the Forum of Regulators process and the APTEL findings, decides that verification happens at year-end with the distribution licensee reporting to the Commission, preserves the security deposit in the form of BG/LC/FD, allows the CGP or captive user to approach the Commission against the licensee's findings, and records the Ministry of Power's designation of the Central Electricity Authority as verification authority for inter-state cases (pp9–12). The approved procedure itself is a separate linked document (p12) and is expressly subject to the final interpretation of Rule 3 by the courts.

Standard name
Captive Generation Regulations
Primary topics
Captive status, Open access, Payment security

Read with this

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document