Skip to content

PSERC · Punjab State Electricity Regulatory Commission

Harnessing of Captive Power Generation Regulations, 2022 — First Amendment, 2026

Punjab State Electricity Regulatory Commission (Harnessing of Captive Power Generation) (First Amendment) Regulations, 2026

AmendmentDated 18 May 2026Published in the Gazette 30 May 2026PSERC/Secy./Regu.205 dated The 18th May, 2026

Amends the Harnessing of Captive Power Generation Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A two-page extraordinary Gazette notification by which PSERC substitutes the banking-of-energy provision in its captive power regulations. Clause 1 (p1) names the instrument the (First Amendment) Regulations, 2026, makes it applicable to all captive generating plants in Punjab, and brings it into force on Gazette publication — the notification is dated 18 May 2026 and the Gazette 30 May 2026.

Clause 2 (p1–2) replaces Regulation 11 of the Principal Regulations in full. The new Regulation 11 makes banking available to a captive user taking power from a renewable-energy-based CGP connected to the intra-state transmission and/or distribution system, on a banking agreement with the distribution licensee and on the terms of the PSERC Intra-State Open Access Regulations, 2011 as amended from time to time. Two provisos narrow it: banked energy may not go to third-party sale, and the CGP and its captive user(s) must keep the Rule 3, Electricity Rules 2005 captive-status conditions satisfied at each financial year-end — failing which the year's banked and utilised energy is treated as infirm power accounted under Regulation 5.2, and grid draw is billed at the relevant category tariff approved in that year's tariff order.

Standard name
Captive Generation Regulations
Primary topics
Energy banking, Captive status

Read with this

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document