RegulationDated 27 Oct 2022Published in the Gazette 28 Oct 2022No. PSERC/Secy./Regu./166 dated The 27th October, 2022
1 amendment to it is on Voltaic, dated 18 May 2026.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is PSERC's principal regulation governing captive generating plants (CGPs) connected to Punjab's intra-state transmission and/or distribution system, issued on 27 October 2022 and published in the State Gazette on 28 October 2022, from which date it comes into force (p1). It replaces the Commission's 2009 captive power regulations.
Regulation 2 defines the working vocabulary — banking, billing cycle, contract demand, captive user, cogeneration, conventional fuel, deviation and deviation charges, firm power, infirm power, standby and startup power/demand, renewable energy source and verifying authority (p1–2). Regulation 3 fixes applicability to all CGPs and cogeneration plants meeting Rule 3 of the Electricity Rules, 2005, and closes one door: a captive user who is also a distribution consumer cannot take net metering, net billing or gross metering under the 2021 rooftop solar regulations (p2–3).
Regulation 4 is the operative core. It confirms the right to construct and operate a CGP and dedicated lines, subjects grid supply from the CGP to the same regime as a generating company, ties connectivity to the Open Access Regulations, and requires registration with the distribution licensee on payment of a fee set in the Schedule of General Charges (p3). It sets the eligibility test for captive status — ownership and annual captive-consumption thresholds — and the annual verification regime to be run by an agency the Commission will approve separately (p3–4). Where verification finds non-compliance, the matter goes to the Commission for adjudication, and the distribution licensee is barred from demanding cross-subsidy surcharge and other exempted charges until that adjudication; if the CGP fails the test for a year, the whole year's generation loses captive benefits (p4).
Regulation 5 governs sale of surplus power to the distribution licensee, splitting firm power by RE-based and conventional-fuel-based CGP (with metering in 15-minute blocks and pricing by discovered solar tariffs or competitive bidding respectively, plus an RPO benefit for RE), and treating uncontracted infirm power as dumped power (p4–5). Regulation 6 routes third-party sale through open access, with STU and licensee facilitation (p5).
Regulation 7 creates the standby and startup power regime — commitment charges on contracted kVA regardless of use, annual day-limits for standby drawal with a longer option for RE-based CGPs, and charge computation rules that differ depending on whether the CGP is itself a consumer of the licensee; startup power is limited to a share of the largest unit's rated capacity and restricted to CGPs without a standby agreement (p5–7). Regulations 8 to 11 cover metering (ABT-compatible special energy meters, AMR to SLDC, GPS time synchronisation), forecasting/scheduling/energy accounting and deviation settlement (deferred to the 2020 DSM and 2019 solar-and-wind regulations), billing timelines and late payment surcharge, and banking of energy — available only to captive users of RE-based CGPs, with no drawal during the peak season and peak load hours, carry-forward within the financial year but lapse at year end, a cap on banked energy as a proportion of monthly consumption, and a direction to the licensee to frame a banking procedure and model agreement for Commission approval within a month (p7–9).
Regulation 12 repeals the 2009 regulations with savings, and renames "CPP" to "CGP" in other instruments; Regulations 13 to 16 preserve the Commission's inherent powers, allow orders and practice directions, and confer difficulty-removal and amendment powers (p9–10).
Read with this
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of PSERC's website on 26 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.