Skip to content

PSERC · Punjab State Electricity Regulatory Commission

Harnessing of Captive Power Generation Regulations, 2022 — Order on objections

Punjab State Electricity Regulatory Commission (Harnessing of Captive Power Generation) Regulations, 2022

OrderDated 27 Oct 2022

Made under the Harnessing of Captive Power Generation Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the PSERC order of 27.10.2022 approving the Punjab State Electricity Regulatory Commission (Harnessing of Captive Power Generation) Regulations, 2022. It records the consultation process (draft notification, 16.08.2022 comment deadline, 17.08.2022 public hearing, seven stakeholders) and then works through objections regulation by regulation, giving PSPCL’s response and the Commission’s findings on each (p1).

Key outcomes: the regulations apply to all captive generating plants (CGPs) connected to the intra-state transmission/distribution system and meeting Electricity Rules 2005, Rule 3 criteria, including co-generation plants; CGPs not connected to the grid or using dedicated lines are outside scope (p3–4, p5–6, p28). Banking is confined to renewable-energy-based CGPs and cannot be extended to conventional-fuel CGPs (p37). Standby power for RE-based CGPs is allowed up to 80 days with commitment charges (p23). The first right of refusal proviso for surplus power sale was deleted (p20). Open-access issues such as Regulation 28(3) reduction of contract demand and power-factor conversion are repeatedly deferred to separate proceedings (p3, p20, p28, p34). Definitions of standby power and verifying authority/agency were amended (p7), metering must follow CEA Regulations (p25), and a detailed banking procedure and model agreement are to be approved separately (p6, p37–38).

Standard name
Captive Generation Regulations
Primary topics
Captive status, Energy banking, Open access

Read with this

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document