Harnessing of Captive Power Generation Regulations, 2022 — Order on objections
Punjab State Electricity Regulatory Commission (Harnessing of Captive Power Generation) Regulations, 2022
OrderDated 27 Oct 2022
Made under the Harnessing of Captive Power Generation Regulations, 2022.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the PSERC order of 27.10.2022 approving the Punjab State Electricity Regulatory Commission (Harnessing of Captive Power Generation) Regulations, 2022. It records the consultation process (draft notification, 16.08.2022 comment deadline, 17.08.2022 public hearing, seven stakeholders) and then works through objections regulation by regulation, giving PSPCL’s response and the Commission’s findings on each (p1).
Key outcomes: the regulations apply to all captive generating plants (CGPs) connected to the intra-state transmission/distribution system and meeting Electricity Rules 2005, Rule 3 criteria, including co-generation plants; CGPs not connected to the grid or using dedicated lines are outside scope (p3–4, p5–6, p28). Banking is confined to renewable-energy-based CGPs and cannot be extended to conventional-fuel CGPs (p37). Standby power for RE-based CGPs is allowed up to 80 days with commitment charges (p23). The first right of refusal proviso for surplus power sale was deleted (p20). Open-access issues such as Regulation 28(3) reduction of contract demand and power-factor conversion are repeatedly deferred to separate proceedings (p3, p20, p28, p34). Definitions of standby power and verifying authority/agency were amended (p7), metering must follow CEA Regulations (p25), and a detailed banking procedure and model agreement are to be approved separately (p6, p37–38).
Read with this
The regulation
- Dated 27 Oct 2022Harnessing of Captive Power Generation Regulations, 2022
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.