Summary
Summary written by software, from pages 1 to 36 of 44. Check the regulator's original before you rely on it.
PSERC disposed of Petition No. 29 of 2022 by order dated 19.04.2023 (p1). PSPCL had sought approval of terms and conditions for a banking facility for solar captive power plants, filed under Sections 42 and 86 of the Electricity Act, 2003 read with Regulation 8(1) of the PSERC Captive Power Generation Regulations, 2009 (p1). The order first records the procedural history: admission on 01.06.2022, PEDA reply on 26.07.2022, hearing on 21.09.2022, notification of the CGP Regulations, 2022 on 27.10.2022 repealing the 2009 Regulations, PSPCL's direction on 24.11.2022 to draft a banking procedure and model agreement, public notice on 07.01.2023, public hearing on 18.01.2023, revised procedure on 28.02.2023, and further reply on 13.03.2023 (pp2–3).
Most of pp3–24 is a clause-by-clause record of objections from ITC, KRBL, Steel City Furnace Association, PSTCL and PEDA and PSPCL's replies. The issues include the captive-user definition, applicability to co-located and co-generation plants, online approvals, application timing, peak-season and peak-hour drawal restrictions, 30% carry-forward cap, dumped energy, line outage liability, captive-status default consequences, banking charges, standby power, metering, security deposit, events of default, removal of difficulty and the model banking agreement (pp3–29).
The Commission's findings start at p29. It holds that the procedure and model agreement must follow the CGP Regulations, 2022, Regulation 11. Co-located co-generation/captive plants fulfilling the CGP Regulations are eligible even without open access; net metering for biomass co-located plants is rejected (pp29–31). The peak seasonal period is held to be 1 June to 30 September, not 31 October, and drawal is barred then. The Commission retains 6.00 PM to 10.00 PM as the no-drawal peak-hours window during that season, subject to review, rather than accepting PSPCL's additional non-paddy peak-hour restrictions (pp31–33). On banking charges, PSPCL proposed 15% in kind; objectors sought much lower rates and cited the Forum of Regulators and other states. The final approved charge and operative directions are not visible in pages 1–36.
Read with this
The regulation
- Dated 27 Oct 2022Harnessing of Captive Power Generation Regulations, 2022
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.