APERC · Andhra Pradesh Electricity Regulatory Commission
Licensees' Standards of Performance Regulation, 2004 — Fifth Amendment, 2024 — Draft
Fifth Amendment to Andhra Pradesh Electricity Regulatory Commission (Licensees' Standards of Performance) Regulation 2024
Draft amendmentDated 26 Jul 2024
Draft
A proposal that has since been finalised as the Licensees' Standards of Performance Regulation, 2004 — Fifth Amendment, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is APERC's draft Fifth Amendment to its Licensees' Standards of Performance Regulation, 2004 (Regulation No. 7 of 2004), issued as a proposal — the Commission says it is "inclined to amend" and the pages are marked "Draft" (p1–2).
The Introduction rehearses the amendment chain: the Principal Regulation notified in 2004 under section 181(2)(za) and (zb) read with sections 57 and 59 of the Electricity Act 2003; a first amendment in 2005; a second in 2013; adoption by the post-bifurcation APERC through its Adoption Regulation, 2014; then third and fourth amendments in 2021 and 2023 (p1). It says the trigger this time is the Electricity (Rights of Consumers) Amendment Rules, 2024, notified by the Government of India on 22 February 2024, which set timelines for a distribution licensee to give a new connection or modify an existing one, and GoI's advice to SERCs to align; DISCOMs, citing a GoAP letter, asked the Commission to act (p1). The Commission adds that its existing timelines are old and need modification "to improve the ease of living", and that the DISCOMs have responded positively (p2).
Clause 1 gives the short title, extends the amendment to the whole of Andhra Pradesh, and brings it into force on publication in the AP Gazette (p2). Clause 2 substitutes Item IX of Schedule II of the Principal Regulation, which deals with release of a new connection or additional load on payment of all charges (p2). The substitution is a table of service area, time standard and compensation for violation, split between events affecting a single consumer and events affecting more than one (pp2–3). It lays down separate time standards for connections feasible from the existing network, graded by area type, and for cases needing network expansion or enhancement, graded by voltage class, with a distinct treatment where a new substation must be commissioned (pp2–3). The draft is signed by order of the Commission at Kurnool on 26.07.2024 (p3).
Read with this
The regulation
- Dated 22 Jun 2004Licensees' Standards of Performance Regulation, 2004
Amendments and corrections
- Published in the Gazette 19 Aug 2005Licensees' Standards of Performance Regulation, 2004 — First Amendment, 2005
- Dated 7 Aug 2013Licensees' Standards of Performance Regulation, 2004 — Second Amendment, 2013
- Dated 4 Jun 2021Licensees' Standards of Performance Regulation, 2004 — 3rd Amendment, 2021
Commencement notices and reasons
Procedures and orders made under it
- Dated 30 Jun 2017Practice Directions on SAIFI and SAIDI Benchmarking for Industrial Feeders, 2017
- Dated 27 Aug 2024Licensees' Standards of Performance Regulation, 2004 — Fifth Amendment, 2024
- Dated 20 May 2026Licensees Standards of Performance (Regulation No. 7 of 2004) — Practice Directions on SAIDI and SAIFI, 2026
Consolidated copies, for reference (1)
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.