APERC · Andhra Pradesh Electricity Regulatory Commission
Licensees' Standards of Performance Regulation, 2004 — Second Amendment, 2013
Andhra Pradesh Electricity Regulatory Commission (Licensees' Standards of Performance) Second Amendment Regulation, 2013.
AmendmentDated 7 Aug 2013Published in the Gazette 8 Aug 2013Regulation No.9 of 2013
Amends the Licensees' Standards of Performance Regulation, 2004.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Second Amendment to the Andhra Pradesh Electricity Regulatory Commission (Licensees' Standards of Performance) Regulation, 2004, issued as Regulation No. 9 of 2013 and published in the A.P. Gazette Extraordinary of 8 August 2013 (p1). The recitals set out the trigger: consumer associations and activists argued at public hearings on DISCOM ARR and FSA filings that the compensation fixed in 2004 had lost its deterrent value, so the Commission issued a draft, took comments and held a public hearing on 5 June 2013 (p1).
The operative text is short. Clause 1 gives the short title and ties commencement to Gazette publication (pp1-2). Clause 2 inserts a fourth provision into clause 5 of the principal regulation: a distribution licensee — expressly including deemed licensees and exemptees — that fails to comply with the Overall Standards of Performance in Schedule-III, or fails to provide service supporting such compliance, is treated as contravening the Act, rules, regulations or Commission directions, and may be penalised after a hearing; penalty receipts may be used by the Commission for Consumer Advocacy (p2).
Clause 3 substitutes Schedule-II in full (pp2-5). The replacement schedule sets, service item by service item, a time standard and the compensation payable on breach, differentiated between cities/towns and rural areas and between events affecting a single consumer and several. It covers fuse-off calls, overhead and underground cable breakdowns, distribution transformer failure, scheduled outages, voltage fluctuation (with separate timelines where network enhancement or a new substation is needed), meter complaints including burnt meters, processing of new-connection and additional-load applications by voltage level, release of supply after payment of charges, title transfer and category/LT-HT conversion, billing complaints, reconnection after disconnection and wrongful disconnection or wrongful reconnection charges (pp2-4).
The same enclosure carries the manner of payment: every complaint must be registered and given a unique complaint identification number; the SMS advising rectification fixes the time of compliance; consumer-wise records must be kept; claims go within 30 days to a designated headquarters officer who also monitors compliance; compensation is paid by adjustment against bills within 90 days; and unaddressed claims escalate to the CGRF and then the Vidyuth Ombudsman (p5).
Read with this
The regulation
- Dated 22 Jun 2004Licensees' Standards of Performance Regulation, 2004
Amendments and corrections
- Published in the Gazette 19 Aug 2005Licensees' Standards of Performance Regulation, 2004 — First Amendment, 2005
- Dated 4 Jun 2021Licensees' Standards of Performance Regulation, 2004 — 3rd Amendment, 2021
Commencement notices and reasons
Procedures and orders made under it
- Dated 30 Jun 2017Practice Directions on SAIFI and SAIDI Benchmarking for Industrial Feeders, 2017
- Dated 27 Aug 2024Licensees' Standards of Performance Regulation, 2004 — Fifth Amendment, 2024
- Dated 20 May 2026Licensees Standards of Performance (Regulation No. 7 of 2004) — Practice Directions on SAIDI and SAIFI, 2026
Consolidated copies, for reference (1)
Earlier drafts
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.